Learn more →Work will include grade the parking areas adjacent to the roadway on the north and south. The control grade for the parking area is the existing roadway, curb and speed table; remove 1 1/2" of the existing graded aggregate base (gab) and the placement of 1 1/2" of sp 12.5 asphalt pavement on the existing gravel areas adjacent to the roadway. The existing roadway will be milled 1 1/2" and 1 1/2" of sp 12. 5 asphalt pavement will be placed. The asphalt will tie into the existing curb and speed hump at the current grades. See attached files.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Work will include grade the parking areas adjacent to the roadway on the north and south. The control grade for the parking area is the existing roadway, curb and speed table; remove 1 1/2" of the existing graded aggregate base (gab) and the placement of 1 1/2" of sp 12.5 asphalt pavement on the existing gravel areas adjacent to the roadway. The existing roadway will be milled 1 1/2" and 1 1/2" of sp 12. 5 asphalt pavement will be placed. The asphalt will tie into the existing curb and speed hump at the current grades. See attached files.
AvailablePhase I: Construction of a parking lot containing approximately 350 parking spaces. The parking lot will include sidewalks both within the parking lot and around the exterior of the parking lot, a dedicated bike lane through the parking lot, retention ponds, lighting and landscaping. Phase II: The demolition and replacement of street. The new construction will include a dedicated two-lane bike lane so bike traffic can enter and exit the Park. The construction of new sidewalks, including a sidewalk under the trestle going to MLK. The new construction will align with the parking lot and include lighting and landscaping.
Posted Date
Nov 24, 2025
Due Date
Dec 29, 2025
Release: Nov 24, 2025
Close: Dec 29, 2025
Phase I: Construction of a parking lot containing approximately 350 parking spaces. The parking lot will include sidewalks both within the parking lot and around the exterior of the parking lot, a dedicated bike lane through the parking lot, retention ponds, lighting and landscaping. Phase II: The demolition and replacement of street. The new construction will include a dedicated two-lane bike lane so bike traffic can enter and exit the Park. The construction of new sidewalks, including a sidewalk under the trestle going to MLK. The new construction will align with the parking lot and include lighting and landscaping.
AvailableMacon-Bibb County is soliciting a Construction Manager at Risk for the expansion of the Law Enforcement Center, with an estimated project budget in the $10M–$50M range. The solicitation is a Request for Proposal opened on 2025-10-23, includes a mandatory pre-bid meeting on 2025-11-05 and a questions due date of 2025-11-07, and closes on 2025-12-04.
Posted Date
Oct 23, 2025
Due Date
Dec 4, 2025
Release: Oct 23, 2025
Close: Dec 4, 2025
Macon-Bibb County is soliciting a Construction Manager at Risk for the expansion of the Law Enforcement Center, with an estimated project budget in the $10M–$50M range. The solicitation is a Request for Proposal opened on 2025-10-23, includes a mandatory pre-bid meeting on 2025-11-05 and a questions due date of 2025-11-07, and closes on 2025-12-04.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis