Discover Opportunities months before the RFP drops
Learn more →Acquire and implement an Information Technology Service Management (ITSM) solution for use in the Port’s Information Management Division.
Posted Date
Dec 1, 2025
Due Date
Jan 12, 2026
Release: Dec 1, 2025
Close: Jan 12, 2026
Acquire and implement an Information Technology Service Management (ITSM) solution for use in the Port’s Information Management Division.
AvailableThe port is updating its stormwater infrastructure master plan (project) to ensure the long-term reliability and resiliency of its stormwater collection and conveyance systems. Since the adoption of the 2013 stormwater infrastructure master plan, new development and aging infrastructure have created changing system demands, highlighting the need for updated condition assessments and modernized hydrologic and hydraulic modeling. To support the successful delivery of this project, the port is seeking a qualified consultant to update the stormwater infrastructure master plan, develop a 20-year stormwater capital improvement program (cip), and update stormwater design criteria and standards.
Posted Date
Nov 30, 2025
Due Date
Dec 9, 2025
Release: Nov 30, 2025
Close: Dec 9, 2025
The port is updating its stormwater infrastructure master plan (project) to ensure the long-term reliability and resiliency of its stormwater collection and conveyance systems. Since the adoption of the 2013 stormwater infrastructure master plan, new development and aging infrastructure have created changing system demands, highlighting the need for updated condition assessments and modernized hydrologic and hydraulic modeling. To support the successful delivery of this project, the port is seeking a qualified consultant to update the stormwater infrastructure master plan, develop a 20-year stormwater capital improvement program (cip), and update stormwater design criteria and standards.
The project will replace the end-of-life asphalt roadway with a new 20-year-life pavement designed in accordance with port and caltrans standards, reducing long-term maintenance costs and bringing the roadway up to current design requirements. To improve traffic flow, enhance safety, and reduce vehicle weaving, the project will reconfigure lanes to separate cars and trucks, consolidate and reconfigure existing ramps, and incorporate intelligent transportation system (its) elements such as dynamic lane-assignment sign boards, changeable message signs, and traffic monitoring. Wayfinding will be improved through the installation of new traffic signs and roadway striping. The project also includes drainage upgrades with a new storm drain system and treatment devices, as well as area beautification through new landscaping, irrigation, and street lighting.
Posted Date
Nov 30, 2025
Due Date
Dec 16, 2025
Release: Nov 30, 2025
Close: Dec 16, 2025
The project will replace the end-of-life asphalt roadway with a new 20-year-life pavement designed in accordance with port and caltrans standards, reducing long-term maintenance costs and bringing the roadway up to current design requirements. To improve traffic flow, enhance safety, and reduce vehicle weaving, the project will reconfigure lanes to separate cars and trucks, consolidate and reconfigure existing ramps, and incorporate intelligent transportation system (its) elements such as dynamic lane-assignment sign boards, changeable message signs, and traffic monitoring. Wayfinding will be improved through the installation of new traffic signs and roadway striping. The project also includes drainage upgrades with a new storm drain system and treatment devices, as well as area beautification through new landscaping, irrigation, and street lighting.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis