Discover Opportunities months before the RFP drops
Learn more →THE PROJECT consists of construction of an aviation fuel facility that includes five 40,000-gallon fuel horizontal aboveground storage tanks (ASTs), with space for three future 40,000-gallon horizontal ASTs, one 12,000-gallon and one 6,000 gallon horizontal AST and the construction of a control building. The project includes grading, drainage, electrical, paving, fencing, structural, architectural, plumbing, and mechanical work.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
Close: Dec 18, 2025
THE PROJECT consists of construction of an aviation fuel facility that includes five 40,000-gallon fuel horizontal aboveground storage tanks (ASTs), with space for three future 40,000-gallon horizontal ASTs, one 12,000-gallon and one 6,000 gallon horizontal AST and the construction of a control building. The project includes grading, drainage, electrical, paving, fencing, structural, architectural, plumbing, and mechanical work.
AvailableProject consists of construction of an aviation fuel facility that includes five 40,000- gal. fuel horizontal aboveground storage tanks (asts), with space for three future 40,000-gal. horizontal asts, one 12,000-gal. and one 6,000 gal. horizontal ast and the construction of a control building. The project includes grading, drainage, electrical, paving, fencing, structural, architectural, plumbing, and mechanical work. See outside link.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Project consists of construction of an aviation fuel facility that includes five 40,000- gal. fuel horizontal aboveground storage tanks (asts), with space for three future 40,000-gal. horizontal asts, one 12,000-gal. and one 6,000 gal. horizontal ast and the construction of a control building. The project includes grading, drainage, electrical, paving, fencing, structural, architectural, plumbing, and mechanical work. See outside link.
AvailableDESIGN-BUILD. The airport is seeking a firm to design and build a solution to replace portions of the HVAC plant, which includes the cooling tower and boiler. The design and installation should be phased so that affected areas of the terminal are still served properly, depending on heating and cooling seasons. It is the intent to hire an experienced Design-Builder who will assist the airport's engineering staff in implementing the Terminal HVAC Equipment Replacement - Boiler Room 1 based on applicable engineering standards and the airport's vital role in its local community. See outside link.
Posted Date
-
Due Date
Oct 29, 2025
Release: -
Close: Oct 29, 2025
DESIGN-BUILD. The airport is seeking a firm to design and build a solution to replace portions of the HVAC plant, which includes the cooling tower and boiler. The design and installation should be phased so that affected areas of the terminal are still served properly, depending on heating and cooling seasons. It is the intent to hire an experienced Design-Builder who will assist the airport's engineering staff in implementing the Terminal HVAC Equipment Replacement - Boiler Room 1 based on applicable engineering standards and the airport's vital role in its local community. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis