Discover Opportunities months before the RFP drops
Learn more →The Joint Municipal Water and Sewer Commission seeks bids for the Edmund Highway/Maple Street Water Improvements project to install 4,130 linear feet of 10-inch and 540 linear feet of 8-inch ductile iron pipe plus appurtenances including fire hydrants, valves, and water services in the Town of Pelion. The project is funded by the State Revolving Fund, requires compliance with AIS and Davis-Bacon regulations, has an estimated construction cost of $1.0M–$1.8M, and will be delivered design-bid-build.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Close: Dec 16, 2025
The Joint Municipal Water and Sewer Commission seeks bids for the Edmund Highway/Maple Street Water Improvements project to install 4,130 linear feet of 10-inch and 540 linear feet of 8-inch ductile iron pipe plus appurtenances including fire hydrants, valves, and water services in the Town of Pelion. The project is funded by the State Revolving Fund, requires compliance with AIS and Davis-Bacon regulations, has an estimated construction cost of $1.0M–$1.8M, and will be delivered design-bid-build.
AvailableWork includes : installation of approx 4,000 LF of 10" water main, 60 LF of 8" water main, 70 LF of 20" steel casing, six fire hydrant assemblies, one air release valve, water service connections and other appurtenances.
Posted Date
Jul 28, 2025
Due Date
Aug 27, 2025
Release: Jul 28, 2025
Close: Aug 27, 2025
Work includes : installation of approx 4,000 LF of 10" water main, 60 LF of 8" water main, 70 LF of 20" steel casing, six fire hydrant assemblies, one air release valve, water service connections and other appurtenances.
Work includes to convert the Town of Swansea's approx. 800 meters to this system with a potential opportunity to convert the remaining 22,000 meters within the Commission's system to an AMI system.
Posted Date
Jul 7, 2025
Due Date
Aug 7, 2025
Release: Jul 7, 2025
Close: Aug 7, 2025
Work includes to convert the Town of Swansea's approx. 800 meters to this system with a potential opportunity to convert the remaining 22,000 meters within the Commission's system to an AMI system.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis