Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Lexington County Joint Municipal Water And Sewer Authority
The Joint Municipal Water and Sewer Commission seeks bids for the Edmund Highway/Maple Street Water Improvements project to install 4,130 linear feet of 10-inch and 540 linear feet of 8-inch ductile iron pipe plus appurtenances including fire hydrants, valves, and water services in the Town of Pelion. The project is funded by the State Revolving Fund, requires compliance with AIS and Davis-Bacon regulations, has an estimated construction cost of $1.0M–$1.8M, and will be delivered design-bid-build.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Pelion
Installation of 4,130 LF of 10" and 540 LF of 8" Ductile Iron Pipe with new and replacement fire hydrants to replace the aging water distribution system.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Town of Pelion
Close: Dec 16, 2025
Installation of 4,130 LF of 10" and 540 LF of 8" Ductile Iron Pipe with new and replacement fire hydrants to replace the aging water distribution system.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Modesto
The City of Modesto is soliciting sealed bids for construction improvements to water main crossings along Highway 99 at I Street, G Street, and Sierra Drive. Bids are submitted electronically via OpenGov, with a notarized bidder’s bond delivered to the City Clerk by the bid deadline.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
City of Modesto
Close: Dec 16, 2025
The City of Modesto is soliciting sealed bids for construction improvements to water main crossings along Highway 99 at I Street, G Street, and Sierra Drive. Bids are submitted electronically via OpenGov, with a notarized bidder’s bond delivered to the City Clerk by the bid deadline.
AvailableCity of Modesto
The City of Modesto is soliciting sealed bids for construction improvements to water main crossings along Highway 99 at I Street, G Street, and Sierra Drive. Bids are submitted electronically via OpenGov, with a notarized bidder’s bond delivered to the City Clerk by the bid deadline.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
City of Modesto
Close: Dec 16, 2025
The City of Modesto is soliciting sealed bids for construction improvements to water main crossings along Highway 99 at I Street, G Street, and Sierra Drive. Bids are submitted electronically via OpenGov, with a notarized bidder’s bond delivered to the City Clerk by the bid deadline.
AvailableCity of Augusta
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
Posted Date
Nov 6, 2025
Due Date
Dec 5, 2025
Release: Nov 6, 2025
City of Augusta
Close: Dec 5, 2025
The work consists of the following: pedestrian safety improvements along water street with curb, drainage, and sidewalk improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →