Discover Opportunities months before the RFP drops
Learn more →Work includes approx 1 LS site clearing; 722 LF pf 30" pvc c900 sanitary pipe' 1 EA 72" doghouse manhole, frame and cover; 5 EA precast concrete manholes. 1 LS mobilization; 1 LS environmental protection and restoration; 1 LS disposal and transportation of regulated materials (allowance); 1 LS site clearing; 275 CY stone foundation (bedding) (min $40/CY); 260 CY dense graded aggregate (if and where directed) (min $20/CY); 722 LF furnish and install 30" pvc c900 sanitary pipe < 10'; 626 LF furnish and install 30" pvc sdr 35 sanitary pipe < 10'; 1,348 LF testing of sanitary pipe; 1 EA 72" doghouse manhole, frame and cover, less than 10' depth; 5 EA precast concrete manholes; 675 SY topsoil, fertilizer, seed, and mulch; utility relocation (allowance). See attached file.
Posted Date
Nov 10, 2025
Due Date
Dec 18, 2025
Release: Nov 10, 2025
Close: Dec 18, 2025
Work includes approx 1 LS site clearing; 722 LF pf 30" pvc c900 sanitary pipe' 1 EA 72" doghouse manhole, frame and cover; 5 EA precast concrete manholes. 1 LS mobilization; 1 LS environmental protection and restoration; 1 LS disposal and transportation of regulated materials (allowance); 1 LS site clearing; 275 CY stone foundation (bedding) (min $40/CY); 260 CY dense graded aggregate (if and where directed) (min $20/CY); 722 LF furnish and install 30" pvc c900 sanitary pipe < 10'; 626 LF furnish and install 30" pvc sdr 35 sanitary pipe < 10'; 1,348 LF testing of sanitary pipe; 1 EA 72" doghouse manhole, frame and cover, less than 10' depth; 5 EA precast concrete manholes; 675 SY topsoil, fertilizer, seed, and mulch; utility relocation (allowance). See attached file.
AvailableConstruction of the proposed building with operable and sufficient facilities as described in the Plans and specifications. This shall include, but not limited to: grading, procurement of fill and foundation subbase material, concrete foundation and pads, pre-engineered wooden structure with framing, casework and finished, operable lighting, plumbing and HVAC fixtures and facilities.
Posted Date
Jul 6, 2025
Due Date
Jul 30, 2025
Release: Jul 6, 2025
Close: Jul 30, 2025
Construction of the proposed building with operable and sufficient facilities as described in the Plans and specifications. This shall include, but not limited to: grading, procurement of fill and foundation subbase material, concrete foundation and pads, pre-engineered wooden structure with framing, casework and finished, operable lighting, plumbing and HVAC fixtures and facilities.
The work includes but is not limited to one (1) construction project to construct a new building system above the dry well, cleaning and coating of the existing wet well structure and the installation of a new grinder assembly. This is consistent with the city’s long-term asset management plan. There will be one construction contract: in 2025 for improvements to the Little Robin Pump Station. Sanitary sewer service will be maintained throughout the construction and repairs through a temporary bypass pumping system. The contract will allow 365 calendar days for substantial completion and 450 calendar days for total completion of the work from issuance of the notice to proceed.
Posted Date
Apr 21, 2025
Due Date
Jun 13, 2025
Release: Apr 21, 2025
Close: Jun 13, 2025
The work includes but is not limited to one (1) construction project to construct a new building system above the dry well, cleaning and coating of the existing wet well structure and the installation of a new grinder assembly. This is consistent with the city’s long-term asset management plan. There will be one construction contract: in 2025 for improvements to the Little Robin Pump Station. Sanitary sewer service will be maintained throughout the construction and repairs through a temporary bypass pumping system. The contract will allow 365 calendar days for substantial completion and 450 calendar days for total completion of the work from issuance of the notice to proceed.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis