Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work includes but is not limited to one (1) construction project to construct a new building system above the dry well, cleaning and coating of the existing wet well structure and the installation of a new grinder assembly. This is consistent with the city’s long-term asset management plan. There will be one construction contract: in 2025 for improvements to the Little Robin Pump Station. Sanitary sewer service will be maintained throughout the construction and repairs through a temporary bypass pumping system. The contract will allow 365 calendar days for substantial completion and 450 calendar days for total completion of the work from issuance of the notice to proceed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction of sewage treatment plant improvements and sanitary sewer replacement.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Construction of sewage treatment plant improvements and sanitary sewer replacement.
AvailableSewer pump station maintenance.
Posted Date
Jun 19, 2025
Due Date
Dec 18, 2025
Release: Jun 19, 2025
Close: Dec 18, 2025
Sewer pump station maintenance.
AvailableWorks includes approx 3,899 LF of 8" Sanitary Sewer Main Prelining Clean and Televise; 3,899 LF of 8" Sanitary Sewer Main Final Televise; 400 LF of 8" Preliner; 3,899 LF of 8" Sanitary Sewer Main Cured-in-Place Pipe; 403 Lateral CIPP liner Additional Footage; See outside link.
Posted Date
Aug 14, 2025
Due Date
Dec 18, 2025
Release: Aug 14, 2025
Close: Dec 18, 2025
Works includes approx 3,899 LF of 8" Sanitary Sewer Main Prelining Clean and Televise; 3,899 LF of 8" Sanitary Sewer Main Final Televise; 400 LF of 8" Preliner; 3,899 LF of 8" Sanitary Sewer Main Cured-in-Place Pipe; 403 Lateral CIPP liner Additional Footage; See outside link.
AvailableImprovements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis