Discover Opportunities months before the RFP drops
Learn more →Replace open channel canal with large diameter pipeline including road improvements, drainage, and earthwork, following the existing South Branch Canal alignment starting downstream of the existing pipeline to open channel canal transition at Station 675+94 (MP 12.8). Construct pipeline and roadway improvements related to canal improvements for 4,128' of pipe between existing canal Station 675+94 (MP 12.8) and Station 718+68 (MP 13.6).
Posted Date
Sep 5, 2025
Due Date
Oct 6, 2025
Release: Sep 5, 2025
Close: Oct 6, 2025
Replace open channel canal with large diameter pipeline including road improvements, drainage, and earthwork, following the existing South Branch Canal alignment starting downstream of the existing pipeline to open channel canal transition at Station 675+94 (MP 12.8). Construct pipeline and roadway improvements related to canal improvements for 4,128' of pipe between existing canal Station 675+94 (MP 12.8) and Station 718+68 (MP 13.6).
Provide a fish facility building to rear and research Yakima Basin endangered fish species and enhance the recovery of the bull trout population. Work to be done in two phases. Phase 1 includes: Install the facility's metal building including the earthwork and foundation, install exterior doors and windows as well as all the underground utilities and plumbing inside and outside of the building. Phase 2 includes: Install all interior structures including the walls, doors, and windows as well as all the mechanical, electrical, and operational equipment inside and outside of the facility.
Posted Date
Aug 22, 2025
Due Date
Sep 26, 2025
Release: Aug 22, 2025
Close: Sep 26, 2025
Provide a fish facility building to rear and research Yakima Basin endangered fish species and enhance the recovery of the bull trout population. Work to be done in two phases. Phase 1 includes: Install the facility's metal building including the earthwork and foundation, install exterior doors and windows as well as all the underground utilities and plumbing inside and outside of the building. Phase 2 includes: Install all interior structures including the walls, doors, and windows as well as all the mechanical, electrical, and operational equipment inside and outside of the facility.
improvements consist of drilling, development and testing of a new 10-inch diameter well,
Posted Date
Aug 17, 2025
Due Date
Sep 19, 2025
Release: Aug 17, 2025
Close: Sep 19, 2025
improvements consist of drilling, development and testing of a new 10-inch diameter well,
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis