Learn more →Work includes installation of approximately 1300 LF of 16" waterline. Disconnection, capping, and abandonment of the existing section of 16" waterline. Connection of the new line to the existing lines, reconnection of service connections, and fire hydrants, installation of valves, one casing, and roadway restoration in the construction area.
Posted Date
-
Due Date
Jun 10, 2025
Release: -
Close: Jun 10, 2025
Work includes installation of approximately 1300 LF of 16" waterline. Disconnection, capping, and abandonment of the existing section of 16" waterline. Connection of the new line to the existing lines, reconnection of service connections, and fire hydrants, installation of valves, one casing, and roadway restoration in the construction area.
Replace approx. 3,200 LF of 16" PVC transmission pipeline, and install an 800 KW backup generator with connections and controls.
Posted Date
Aug 20, 2024
Due Date
Sep 17, 2024
Release: Aug 20, 2024
Close: Sep 17, 2024
Replace approx. 3,200 LF of 16" PVC transmission pipeline, and install an 800 KW backup generator with connections and controls.
Retrofit of existing wet well to accommodate new pumps (including bypass pumping), a new CMU block building to house the lift station electrical and controls, provisions for accommodating a permanent generator and piping connecting to the nearby existing force main.
Posted Date
Aug 5, 2024
Due Date
Sep 18, 2024
Release: Aug 5, 2024
Close: Sep 18, 2024
Retrofit of existing wet well to accommodate new pumps (including bypass pumping), a new CMU block building to house the lift station electrical and controls, provisions for accommodating a permanent generator and piping connecting to the nearby existing force main.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis