Discover Opportunities months before the RFP drops
Learn more →Jordan Valley Water Conservancy District seeks proposals for HVAC upgrades at the JVWTP Washwater Reclaim Pump Station #2, including replacing the existing roof-mounted HVAC unit and installing guards over skylights.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
Jordan Valley Water Conservancy District seeks proposals for HVAC upgrades at the JVWTP Washwater Reclaim Pump Station #2, including replacing the existing roof-mounted HVAC unit and installing guards over skylights.
AvailableWork consists of replacing the existing roof mounted HVAC unit along with installing guards over two skylights.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
Work consists of replacing the existing roof mounted HVAC unit along with installing guards over two skylights.
AvailableWork consists of installation of a new 24" welded steel pipeline to parallel an existing line which will increase capacity and reliability to the existing system and assist the district in meeting future water demands. The work also includes various vaults, valves, and other appurtenances to help bring the new pipeline into full working order. Work also includes, 3,067 CY of utbc, 8" thickness - rosecrest road from 13400 south to rocky point drive with material testing; 13,800 SY of 6" asphalt pavement - rosecrest roadway, 13400 south to rocky point drive; 19,500 SY of 3" mill & overlay - rosecrest road from rocky point drive to crown rose drive; 35 LF of concrete waterway replacement.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Work consists of installation of a new 24" welded steel pipeline to parallel an existing line which will increase capacity and reliability to the existing system and assist the district in meeting future water demands. The work also includes various vaults, valves, and other appurtenances to help bring the new pipeline into full working order. Work also includes, 3,067 CY of utbc, 8" thickness - rosecrest road from 13400 south to rocky point drive with material testing; 13,800 SY of 6" asphalt pavement - rosecrest roadway, 13400 south to rocky point drive; 19,500 SY of 3" mill & overlay - rosecrest road from rocky point drive to crown rose drive; 35 LF of concrete waterway replacement.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis