Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Jordan Valley Water Conservancy District seeks proposals for HVAC upgrades at the JVWTP Washwater Reclaim Pump Station #2, including replacing the existing roof-mounted HVAC unit and installing guards over skylights.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of replacing the existing roof mounted HVAC unit along with installing guards over two skylights.
Posted Date
Nov 20, 2025
Due Date
Dec 15, 2025
Release: Nov 20, 2025
Close: Dec 15, 2025
Work consists of replacing the existing roof mounted HVAC unit along with installing guards over two skylights.
AvailableRemoval and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Jun 18, 2025
Due Date
Jan 15, 2026
Release: Jun 18, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
AvailableRemoval and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
Posted Date
Nov 26, 2025
Due Date
Jan 15, 2026
Release: Nov 26, 2025
Close: Jan 15, 2026
Removal and disposal of two suction lift pumps, one back-up gas engine, pump controls, piping and valves in the pump station and wet well, various electrical equipment, 500-gallon LP gas aboveground storage tank and related appurtenances. Abandonment of wet well and various repairs to the pump station aboveground building. Furnish and installation of new submersible pumps, wet well, valve vault, piping and valves, electric generator, electrical and instrumentation work.
AvailableLump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
Posted Date
Nov 26, 2025
Due Date
Dec 17, 2025
Release: Nov 26, 2025
Close: Dec 17, 2025
Lump-sum construction services to upgrade three pump stations (Gretel Terrace, Denkers Drive, Settlers Lane) including replacement of pump guide rails/adapters/discharge piping, level sensing instrumentation, pump station control panels, integration with Town SCADA, miscellaneous electrical upgrades, and site restoration. Requires NY prevailing wage compliance, 5% bid security, and 100% performance and payment bonds.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis