Discover Opportunities months before the RFP drops
Learn more →Jensen Water Improvement District seeks bids to construct the Redwash Road Waterline including installation of approximately 7,000 ft of 8" HDPE waterline, associated fire hydrants, gate valves, and air vac valves; the project must be completed by November 15, 2026. Bidders must submit bids for this project and the tied UTSSD Redwash Road Improvements project (RA26-66); a mandatory pre-bid conference is scheduled for Dec 15, 2025 and bids are due Dec 22, 2025 at 1:00 PM local time.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
Jensen Water Improvement District seeks bids to construct the Redwash Road Waterline including installation of approximately 7,000 ft of 8" HDPE waterline, associated fire hydrants, gate valves, and air vac valves; the project must be completed by November 15, 2026. Bidders must submit bids for this project and the tied UTSSD Redwash Road Improvements project (RA26-66); a mandatory pre-bid conference is scheduled for Dec 15, 2025 and bids are due Dec 22, 2025 at 1:00 PM local time.
AvailableConstruction of ~7,000 ft of 8-inch HDPE waterline in Jensen, UT including tie‑ins to existing mains and service lines, installation of fire hydrants, gate valves, and air‑vac valves. Unit-price construction bid; owner estimate ~$675,000. Mandatory pre-bid conference required; project is tied to one other project and bidders must bid both. 5% bid security (bond) required. Substantial completion scheduled by Nov 15, 2026.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of ~7,000 ft of 8-inch HDPE waterline in Jensen, UT including tie‑ins to existing mains and service lines, installation of fire hydrants, gate valves, and air‑vac valves. Unit-price construction bid; owner estimate ~$675,000. Mandatory pre-bid conference required; project is tied to one other project and bidders must bid both. 5% bid security (bond) required. Substantial completion scheduled by Nov 15, 2026.
AvailableConstruction of 7,000 ft of 8-inch HDPE waterline with tie-ins to existing mains and service lines; installation of fire hydrants, gate valves, and air-vac valves. Project is bid as a single contract tied to one other project (bidders must bid all tied items). Mandatory pre-bid conference attendance required. Owner estimate ~$675,000; completion expected by 2026-11-15.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of 7,000 ft of 8-inch HDPE waterline with tie-ins to existing mains and service lines; installation of fire hydrants, gate valves, and air-vac valves. Project is bid as a single contract tied to one other project (bidders must bid all tied items). Mandatory pre-bid conference attendance required. Owner estimate ~$675,000; completion expected by 2026-11-15.
AvailableMore RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis