Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of 7,000 ft of 8-inch HDPE waterline with tie-ins to existing mains and service lines; installation of fire hydrants, gate valves, and air-vac valves. Project is bid as a single contract tied to one other project (bidders must bid all tied items). Mandatory pre-bid conference attendance required. Owner estimate ~$675,000; completion expected by 2026-11-15.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction of Redwash Road: removal and replacement of ~4.6 miles of roadway including widening, culverts, retaining walls, guard rails, delineator posts, and signs. Bids are tied to a concurrent Redwash Road waterline project and bidders must bid both tied projects; attendance at a mandatory pre-bid conference is required. Owner estimates total bid price ≈ $21,000,000 and expects completion by 2026-09-30.
Posted Date
Nov 25, 2025
Due Date
Dec 22, 2025
Release: Nov 25, 2025
Close: Dec 22, 2025
Construction of Redwash Road: removal and replacement of ~4.6 miles of roadway including widening, culverts, retaining walls, guard rails, delineator posts, and signs. Bids are tied to a concurrent Redwash Road waterline project and bidders must bid both tied projects; attendance at a mandatory pre-bid conference is required. Owner estimates total bid price ≈ $21,000,000 and expects completion by 2026-09-30.
AvailableConstruction of ~7,000 ft of 8-inch HDPE waterline in Jensen, UT including tie‑ins to existing mains and service lines, installation of fire hydrants, gate valves, and air‑vac valves. Unit-price construction bid; owner estimate ~$675,000. Mandatory pre-bid conference required; project is tied to one other project and bidders must bid both. 5% bid security (bond) required. Substantial completion scheduled by Nov 15, 2026.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of ~7,000 ft of 8-inch HDPE waterline in Jensen, UT including tie‑ins to existing mains and service lines, installation of fire hydrants, gate valves, and air‑vac valves. Unit-price construction bid; owner estimate ~$675,000. Mandatory pre-bid conference required; project is tied to one other project and bidders must bid both. 5% bid security (bond) required. Substantial completion scheduled by Nov 15, 2026.
AvailableJensen Water Improvement District seeks bids to construct the Redwash Road Waterline including installation of approximately 7,000 ft of 8" HDPE waterline, associated fire hydrants, gate valves, and air vac valves; the project must be completed by November 15, 2026. Bidders must submit bids for this project and the tied UTSSD Redwash Road Improvements project (RA26-66); a mandatory pre-bid conference is scheduled for Dec 15, 2025 and bids are due Dec 22, 2025 at 1:00 PM local time.
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
Jensen Water Improvement District seeks bids to construct the Redwash Road Waterline including installation of approximately 7,000 ft of 8" HDPE waterline, associated fire hydrants, gate valves, and air vac valves; the project must be completed by November 15, 2026. Bidders must submit bids for this project and the tied UTSSD Redwash Road Improvements project (RA26-66); a mandatory pre-bid conference is scheduled for Dec 15, 2025 and bids are due Dec 22, 2025 at 1:00 PM local time.
AvailableConstruction of Redwash Road: removal and replacement of approximately 4.6 miles of roadway including widening and installation of culverts, retaining walls, guard rails, delineator posts, and signs. Single contract; bidders must also bid on one tied project (combined award). Mandatory pre-bid conference attendance required. Owner estimates total bid price ≈ $11,500,000.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Construction of Redwash Road: removal and replacement of approximately 4.6 miles of roadway including widening and installation of culverts, retaining walls, guard rails, delineator posts, and signs. Single contract; bidders must also bid on one tied project (combined award). Mandatory pre-bid conference attendance required. Owner estimates total bid price ≈ $11,500,000.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis