Discover Opportunities months before the RFP drops
Learn more →Work includes demolition of an existing bridge and the construction of a new 99-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
Posted Date
Nov 26, 2025
Due Date
Dec 29, 2025
Release: Nov 26, 2025
Close: Dec 29, 2025
Work includes demolition of an existing bridge and the construction of a new 99-foot single span prestressed concrete NU girder bridge. Guardrail, riprap, and permanent erosion control will be installed along with any other incidental work.
AvailableSupply of riveted corrugated metal pipe (C. M. P.), polypropylene and polyethylene pipe.
Posted Date
Nov 13, 2025
Due Date
Dec 1, 2025
Release: Nov 13, 2025
Close: Dec 1, 2025
Supply of riveted corrugated metal pipe (C. M. P.), polypropylene and polyethylene pipe.
Supply of 50,000 TN of 1 1/4" crushed stone; 20,000 TN of 1" crushed stone; 40,000 TN of 1" base rock; 5,000 TN of 2" road rock; 8,000 TN of 3" base rock; 20,000 TN of shot rock/rip rap; 15,000 TN of type #1 rip rap; 5,000 TN of type 3 base rock; 5,000 TN of gabion stone.
Posted Date
Nov 13, 2025
Due Date
Dec 1, 2025
Release: Nov 13, 2025
Close: Dec 1, 2025
Supply of 50,000 TN of 1 1/4" crushed stone; 20,000 TN of 1" crushed stone; 40,000 TN of 1" base rock; 5,000 TN of 2" road rock; 8,000 TN of 3" base rock; 20,000 TN of shot rock/rip rap; 15,000 TN of type #1 rip rap; 5,000 TN of type 3 base rock; 5,000 TN of gabion stone.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis