Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Holt County
Supply of 50,000 TN of 1 1/4" crushed stone; 20,000 TN of 1" crushed stone; 40,000 TN of 1" base rock; 5,000 TN of 2" road rock; 8,000 TN of 3" base rock; 20,000 TN of shot rock/rip rap; 15,000 TN of type #1 rip rap; 5,000 TN of type 3 base rock; 5,000 TN of gabion stone.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Fayette County
Provide material proposal 2026 maintenance, various road districts.
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
Fayette County
Close: Dec 9, 2025
Provide material proposal 2026 maintenance, various road districts.
AvailableGuernsey County
2026 road materials.
Posted Date
Nov 2, 2025
Due Date
Nov 18, 2025
St. Clair County Road Commission
Furnishing 2026 requirements of the following materials and services: Crack Sealant; 2. Bituminous Materials - Plant Mix; 2a. Bituminous Materials – Cold Patch; 3a. Limestone Aggregates - Private Dock; 4. Corrugated Metal Pipe; 6. Signs, Blanks and Sheeting; 8. Steel Beam Guardrail; 9. Scraper Blades and Cutting Tips; 11. Diesel and Gasoline; 13. Natural Aggregate; SERVICES; B. Limestone Haul; F. Contractor Equipment Rental Services with and without operator,; our job site; G. Catch Basin Cleaning and Pipe Jetting; P. Phragmites and Intersection Spraying; S. Mowing on I-94, the Lapeer Connector and BL-69.
Posted Date
Nov 5, 2025
Due Date
Jan 13, 2026
Release: Nov 5, 2025
St. Clair County Road Commission
Close: Jan 13, 2026
Furnishing 2026 requirements of the following materials and services: Crack Sealant; 2. Bituminous Materials - Plant Mix; 2a. Bituminous Materials – Cold Patch; 3a. Limestone Aggregates - Private Dock; 4. Corrugated Metal Pipe; 6. Signs, Blanks and Sheeting; 8. Steel Beam Guardrail; 9. Scraper Blades and Cutting Tips; 11. Diesel and Gasoline; 13. Natural Aggregate; SERVICES; B. Limestone Haul; F. Contractor Equipment Rental Services with and without operator,; our job site; G. Catch Basin Cleaning and Pipe Jetting; P. Phragmites and Intersection Spraying; S. Mowing on I-94, the Lapeer Connector and BL-69.
AvailableHolt County
Supply of riveted corrugated metal pipe (C. M. P.), polypropylene and polyethylene pipe.
Posted Date
Nov 13, 2025
Due Date
Dec 1, 2025
Release: Nov 13, 2025
Holt County
Close: Dec 1, 2025
Supply of riveted corrugated metal pipe (C. M. P.), polypropylene and polyethylene pipe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis