Discover Opportunities months before the RFP drops
Learn more →Design-build HVAC system for a portion of the visual arts center. The scope of this request requires and includes the development of stamped engineered mechanical and electrical drawings, equipment, installation and inspection.
Posted Date
Oct 16, 2025
Due Date
Oct 27, 2025
Release: Oct 16, 2025
Close: Oct 27, 2025
Design-build HVAC system for a portion of the visual arts center. The scope of this request requires and includes the development of stamped engineered mechanical and electrical drawings, equipment, installation and inspection.
Work include hvac replacement. 1 EA carrier 15-ton packaged gas/electric air conditioner: heating input - 240,000 btuh, 80% afue, 2-stage. Cooling capacity - 180,000 btuh, 11.2 eer, dual stage. Electric - 460 volt, 3ph, 60hz; 1 EA carrier 7.5-ton packaged gas/electric air conditioner: heating input - 180,000 btuh, 80% afue, 2-stage. Cooling capacity - 90,000 btuh, 11.2 eer, dual stage. Electric - 460 volt, 3ph, 60hz.
Posted Date
Sep 11, 2025
Due Date
Sep 26, 2025
Release: Sep 11, 2025
Close: Sep 26, 2025
Work include hvac replacement. 1 EA carrier 15-ton packaged gas/electric air conditioner: heating input - 240,000 btuh, 80% afue, 2-stage. Cooling capacity - 180,000 btuh, 11.2 eer, dual stage. Electric - 460 volt, 3ph, 60hz; 1 EA carrier 7.5-ton packaged gas/electric air conditioner: heating input - 180,000 btuh, 80% afue, 2-stage. Cooling capacity - 90,000 btuh, 11.2 eer, dual stage. Electric - 460 volt, 3ph, 60hz.
Release: Aug 23, 2025
Close: Aug 29, 2025
Replace 22 white, vinyl windows.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis