Learn more →Gabion Wall Repair.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Gabion Wall Repair.
AvailableSanitary Sewer. Including 850 LF of 12" PVC gravity sewer with bedding; 170 LF of 6" PVC gravity sewer lateral with bedding; 170 LF of 6" utility excavation and backfill 0'-8' deep; 175 LF of 12" utility excavation and backfill 0'-8' deep; 675 LF of 12" utility excavation and backfill 8'-12' deep; 1 ea connection to existing manhole; 27 VF 4-foot diameter manhole; 75 LF of 6" gravity sewer lateral - horizontal auger boring; 50 LF of 12" gravity sewer main - horizontal auger boring (alternate placement); 120 SY paved driveway restoration, base; 5 LF concrete curb; 40 SY municipal road restoration; 5 Sy replace unsuitable bearing material; 5 Cy special stone backfill; 5 CY miscellaneous concrete; 2 ea repair of unmarked utilities.
Posted Date
Jan 24, 2025
Due Date
Feb 14, 2025
Release: Jan 24, 2025
Close: Feb 14, 2025
Sanitary Sewer. Including 850 LF of 12" PVC gravity sewer with bedding; 170 LF of 6" PVC gravity sewer lateral with bedding; 170 LF of 6" utility excavation and backfill 0'-8' deep; 175 LF of 12" utility excavation and backfill 0'-8' deep; 675 LF of 12" utility excavation and backfill 8'-12' deep; 1 ea connection to existing manhole; 27 VF 4-foot diameter manhole; 75 LF of 6" gravity sewer lateral - horizontal auger boring; 50 LF of 12" gravity sewer main - horizontal auger boring (alternate placement); 120 SY paved driveway restoration, base; 5 LF concrete curb; 40 SY municipal road restoration; 5 Sy replace unsuitable bearing material; 5 Cy special stone backfill; 5 CY miscellaneous concrete; 2 ea repair of unmarked utilities.
Work includes low pressure sewer and pressure laterals (hdd or open cut installation) 4,200 LF 1.5" lateral; 2,500 LF 2.0" main; 9,800 LF 3.0" main; 2,700 LF 4.0" main; 92 EA pressure connection to low pressure sewer; 92 EA installation of residential grinder pump stations; 1 EA combination air/vacuum release valve and manhole; 1 EA pre-cast concrete valve vault. See attached file.
Posted Date
Sep 10, 2024
Due Date
Oct 1, 2024
Release: Sep 10, 2024
Close: Oct 1, 2024
Work includes low pressure sewer and pressure laterals (hdd or open cut installation) 4,200 LF 1.5" lateral; 2,500 LF 2.0" main; 9,800 LF 3.0" main; 2,700 LF 4.0" main; 92 EA pressure connection to low pressure sewer; 92 EA installation of residential grinder pump stations; 1 EA combination air/vacuum release valve and manhole; 1 EA pre-cast concrete valve vault. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis