Discover Opportunities months before the RFP drops
Learn more →Provide WWTP air header replacement. Project consists of removing and replacing approx. 215 LF of existing 18" ductile iron pipe, fittings and appurtenances on an existing wastewater treatment plant air blower system, along with approx. 20 LF of 12" ductile iron pipe, fittings and two 12" butterfly valves. Contractor shall also restore concrete pavement disturbed by construction, expand existing concrete driveway, and recoat existing ductile iron pipe air header.
Posted Date
-
Due Date
Dec 16, 2025
Close: Dec 16, 2025
Provide WWTP air header replacement. Project consists of removing and replacing approx. 215 LF of existing 18" ductile iron pipe, fittings and appurtenances on an existing wastewater treatment plant air blower system, along with approx. 20 LF of 12" ductile iron pipe, fittings and two 12" butterfly valves. Contractor shall also restore concrete pavement disturbed by construction, expand existing concrete driveway, and recoat existing ductile iron pipe air header.
Available$5,405,000 unlimited tax bonds, series 2025.
Posted Date
Oct 22, 2025
Due Date
Nov 3, 2025
Release: Oct 22, 2025
Close: Nov 3, 2025
$5,405,000 unlimited tax bonds, series 2025.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis