Discover Opportunities months before the RFP drops
Learn more →Provide MetroRail platform rail map replacement. This work consists of furnishing all the necessary equipment, materials, traffic control, personnel, barricades, and supervision to print and install new signage for the rail platforms along the METRORail red, green and purple lines. See attached files.
Posted Date
Nov 24, 2025
Due Date
Dec 24, 2025
Release: Nov 24, 2025
Close: Dec 24, 2025
Provide MetroRail platform rail map replacement. This work consists of furnishing all the necessary equipment, materials, traffic control, personnel, barricades, and supervision to print and install new signage for the rail platforms along the METRORail red, green and purple lines. See attached files.
AvailableProject is to clean, prime, remove rust and paint the support and canopy steel structures at rail platforms.
Posted Date
Nov 24, 2025
Due Date
Jan 7, 2026
Release: Nov 24, 2025
Close: Jan 7, 2026
Project is to clean, prime, remove rust and paint the support and canopy steel structures at rail platforms.
AvailableThis project will consist of removing one (1) jack assembly, installing a protective casing around the jack assembly, and installing a new jack assembly. Both elevators will require demolishing the elevator interior, installing the new elevator interior, installing a new elevator pump, installing a new pump housing unit, installing a new controller, replacing the elevator hydraulic fluid, performing elevator shaft updates, performing any necessary fireproofing, performing fire suppression updates, and all other work. See attached files.
Posted Date
Nov 10, 2025
Due Date
Dec 17, 2025
Release: Nov 10, 2025
Close: Dec 17, 2025
This project will consist of removing one (1) jack assembly, installing a protective casing around the jack assembly, and installing a new jack assembly. Both elevators will require demolishing the elevator interior, installing the new elevator interior, installing a new elevator pump, installing a new pump housing unit, installing a new controller, replacing the elevator hydraulic fluid, performing elevator shaft updates, performing any necessary fireproofing, performing fire suppression updates, and all other work. See attached files.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis