Discover Opportunities months before the RFP drops
Learn more →Provide the construction and appurtenances of approx. 70 acres site necessary to construct a 54-acre storm water detention pond north of and adjacent to an existing detention pond owned by the city. Construction will consist of: clearing trees and brush from the site, excavating soil to the limits is shown on the plans, disposing of excavated soil, compacting in-place the finished surface of the detention pond, all weather access road, erosion control, inlet and outlet structures, conveyance channels, concrete swale drain, back-slope swale drain with downspouts as shown on plans and a storm water pollution prevention plan. The following is an approx. summary of items: Clearing and brush removal of approx. 65 acres. See attached file.
Posted Date
Dec 18, 2025
Due Date
Jan 13, 2026
Release: Dec 18, 2025
Close: Jan 13, 2026
Provide the construction and appurtenances of approx. 70 acres site necessary to construct a 54-acre storm water detention pond north of and adjacent to an existing detention pond owned by the city. Construction will consist of: clearing trees and brush from the site, excavating soil to the limits is shown on the plans, disposing of excavated soil, compacting in-place the finished surface of the detention pond, all weather access road, erosion control, inlet and outlet structures, conveyance channels, concrete swale drain, back-slope swale drain with downspouts as shown on plans and a storm water pollution prevention plan. The following is an approx. summary of items: Clearing and brush removal of approx. 65 acres. See attached file.
AvailableWork includes approx 8,020 LF of subgrade, base and roadway surface construction; approx16,040 LF of roadside ditch excavation; approx465 LF of storm sewer installation; approx 508 LF of guard rail and related item installation. See attached file.
Posted Date
-
Due Date
Oct 15, 2025
Release: -
Close: Oct 15, 2025
Work includes approx 8,020 LF of subgrade, base and roadway surface construction; approx16,040 LF of roadside ditch excavation; approx465 LF of storm sewer installation; approx 508 LF of guard rail and related item installation. See attached file.
The project scope for the project includes but is not limited to: Traffic control as required, including all barricades, signs and traffic handling; Install SWPPP; Prepare work area including removing vegetation and other obstructions; Install reinforced concrete walls and rip rap; Install concrete through void entry holes; Hydro-Mulch all disturbed areas. See attached files
Posted Date
Jan 22, 2025
Due Date
Feb 5, 2025
Release: Jan 22, 2025
Close: Feb 5, 2025
The project scope for the project includes but is not limited to: Traffic control as required, including all barricades, signs and traffic handling; Install SWPPP; Prepare work area including removing vegetation and other obstructions; Install reinforced concrete walls and rip rap; Install concrete through void entry holes; Hydro-Mulch all disturbed areas. See attached files
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis