Discover Opportunities months before the RFP drops
Learn more →Removal and disposal of all components of the existing SR 878 corridor high-pressure Sodium (HPS) lighting system and the installation of a new smart lighting system for the corridor using light-emitting diode (LED) luminaires.
Posted Date
Dec 1, 2025
Due Date
Jan 7, 2026
Release: Dec 1, 2025
Close: Jan 7, 2026
Removal and disposal of all components of the existing SR 878 corridor high-pressure Sodium (HPS) lighting system and the installation of a new smart lighting system for the corridor using light-emitting diode (LED) luminaires.
AvailableProvide construction services.
Posted Date
Nov 30, 2025
Due Date
Jan 9, 2026
Release: Nov 30, 2025
Close: Jan 9, 2026
Provide construction services.
AvailableDesign-build: work includes systemwide blind spot cameras and camera lowering device replacement.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Design-build: work includes systemwide blind spot cameras and camera lowering device replacement.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis