Discover Opportunities months before the RFP drops
Learn more →Clean and inspect drinking water storage tanks.
Posted Date
-
Due Date
Jan 7, 2026
Close: Jan 7, 2026
Clean and inspect drinking water storage tanks.
AvailableFiber Optic Switch / Cable Installation and Cable Repair. 1. Install a new 24 strand fiber optic cable through an existing empty 4” diameter, 4,000’ long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2. Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
Posted Date
-
Due Date
Nov 26, 2025
Close: Nov 26, 2025
Fiber Optic Switch / Cable Installation and Cable Repair. 1. Install a new 24 strand fiber optic cable through an existing empty 4” diameter, 4,000’ long PVC conduit between the wastewater treatment plant and a structure located near Bridge on the rail trail. 2. Troubleshoot and repair an existing daisy chained fiber optic network located on the Rail Trail between the wastewater treatment plant and Memorial Bridge in Augusta, Maine. The network has failed and needs to be spliced to be repaired.
Work includes small building addition, minor electrical relocation, minor demolition and exterior water main and drain line piping.
Posted Date
Sep 14, 2025
Due Date
Oct 8, 2025
Release: Sep 14, 2025
Close: Oct 8, 2025
Work includes small building addition, minor electrical relocation, minor demolition and exterior water main and drain line piping.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis