Discover Opportunities months before the RFP drops
Learn more →The proposed construction will include existing bridge superstructure removal, installation of new steel i-beam superstructure, new reinforced concrete approach slabs, and guardrail. Additional work consists of conversion to semi-integral end bents, installation of new reinforced concrete approach slabs, and guardrail; and all incidental work required, as specified in the contract document and plans. Construction engineering; mobilization and demobilization; clearing right-of-way; present structure, remove portions, structure no; 24 CY excavation, common; 425 CY borrow; 4 CY sediment, remove; 910 LF filter sock; 861 SY manufactured surface protection product; 1 EA mobilization and demobilization for surface stabilization; 20 CY excavation, foundation, unclassified. See attached file.
Posted Date
Oct 21, 2025
Due Date
Nov 17, 2025
Release: Oct 21, 2025
Close: Nov 17, 2025
The proposed construction will include existing bridge superstructure removal, installation of new steel i-beam superstructure, new reinforced concrete approach slabs, and guardrail. Additional work consists of conversion to semi-integral end bents, installation of new reinforced concrete approach slabs, and guardrail; and all incidental work required, as specified in the contract document and plans. Construction engineering; mobilization and demobilization; clearing right-of-way; present structure, remove portions, structure no; 24 CY excavation, common; 425 CY borrow; 4 CY sediment, remove; 910 LF filter sock; 861 SY manufactured surface protection product; 1 EA mobilization and demobilization for surface stabilization; 20 CY excavation, foundation, unclassified. See attached file.
The project will consist of construction inspection for striping and sign replacement.
Posted Date
Oct 21, 2025
Due Date
Nov 17, 2025
Release: Oct 21, 2025
Close: Nov 17, 2025
The project will consist of construction inspection for striping and sign replacement.
The project will consist of construction inspection bridge #202.
Posted Date
Oct 21, 2025
Due Date
Nov 17, 2025
Release: Oct 21, 2025
Close: Nov 17, 2025
The project will consist of construction inspection bridge #202.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis