Discover Opportunities months before the RFP drops
Learn more →Provide and install a whole building generator system for the Center. The goal of this project is to ensure uninterrupted electrical service to the entire facility in the event of a power outage. The selected contractor shall provide all labor, materials, and services necessary for the design, supply, installation, and commissioning of a reliable generator system capable of powering the entire building. Scope includes Site Assessment and Load Analysis Determination of the best location of the generator to meet all code requirements. System Design and Sizing Recommendation, Generator Set and ATS Supply (Automatic Transfer Switch), Fuel System to be natural gas. Contractor to connect to Owners existing service. Composite Pad and Mounting, Electrical Installation & Integration with Building Panel, Permit Acquisition and Code Compliance, Testing, Start-up, and Commissioning, User Training and Documentation.
Posted Date
Aug 14, 2025
Due Date
Sep 8, 2025
Release: Aug 14, 2025
Close: Sep 8, 2025
Provide and install a whole building generator system for the Center. The goal of this project is to ensure uninterrupted electrical service to the entire facility in the event of a power outage. The selected contractor shall provide all labor, materials, and services necessary for the design, supply, installation, and commissioning of a reliable generator system capable of powering the entire building. Scope includes Site Assessment and Load Analysis Determination of the best location of the generator to meet all code requirements. System Design and Sizing Recommendation, Generator Set and ATS Supply (Automatic Transfer Switch), Fuel System to be natural gas. Contractor to connect to Owners existing service. Composite Pad and Mounting, Electrical Installation & Integration with Building Panel, Permit Acquisition and Code Compliance, Testing, Start-up, and Commissioning, User Training and Documentation.
Release: Jun 5, 2025
Close: Jun 11, 2025
Pulverizing and fine grading.
Work includes to remove two existing boilers related pumps and piping serving Jail; remove venting materials; install three new boilers, pumps, accessories and related piping; install new venting; remove/install gas piping as required; provide new controls and wiring; install new mini split air conditioner in IT room; install new mini split system in Pod area; provide new controls and wiring; remove existing air handler and condenser serving IT room and Pod area.
Posted Date
Jul 18, 2024
Due Date
Aug 1, 2024
Release: Jul 18, 2024
Close: Aug 1, 2024
Work includes to remove two existing boilers related pumps and piping serving Jail; remove venting materials; install three new boilers, pumps, accessories and related piping; install new venting; remove/install gas piping as required; provide new controls and wiring; install new mini split air conditioner in IT room; install new mini split system in Pod area; provide new controls and wiring; remove existing air handler and condenser serving IT room and Pod area.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis