Discover Opportunities months before the RFP drops
Learn more →The Project consists of repairs and improvements to the underground utilidor tunnel network connecting various buildings at College’s campus. The utilidor network contains active and decommissioned steam piping, electrical power distribution, communications cabling, and other utilities. At several locations, underground water and sewer lines pass perpendicularly through the utilidor. The utilidor network suffers from water intrusion caused by the internal steam distribution system, severe condensation on the cast-in-place concrete lids and associated steel decking, chronic leaks at the joint between the utilidor walls and lids, cracks and utility (active and abandoned) penetrations at tunnel walls, and other sources. The primary purpose of this Project is the reduce the quantity of water entering the utilidor network, to replace materials damaged by prior water intrusion, and to protect basement utility spaces served by the utilidor system from flooding.
Posted Date
Jan 30, 2025
Due Date
Feb 20, 2025
Release: Jan 30, 2025
Close: Feb 20, 2025
The Project consists of repairs and improvements to the underground utilidor tunnel network connecting various buildings at College’s campus. The utilidor network contains active and decommissioned steam piping, electrical power distribution, communications cabling, and other utilities. At several locations, underground water and sewer lines pass perpendicularly through the utilidor. The utilidor network suffers from water intrusion caused by the internal steam distribution system, severe condensation on the cast-in-place concrete lids and associated steel decking, chronic leaks at the joint between the utilidor walls and lids, cracks and utility (active and abandoned) penetrations at tunnel walls, and other sources. The primary purpose of this Project is the reduce the quantity of water entering the utilidor network, to replace materials damaged by prior water intrusion, and to protect basement utility spaces served by the utilidor system from flooding.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis