Discover Opportunities months before the RFP drops
Learn more →Design-build project to include – replacing all of the windows; replacing the main entrance storefront, vestibule and doors; replacing the main entrance canopy; replacing secondary exterior doors and associated frames; connecting all doors included as part of the existing access control and security systems; cleaning and repairing the retaining walls at the front of the building; cleaning all concrete walks and ramps; repairing or replacing all damaged concrete walks and ramps; repairing or replacing all railings, and guardrails; installing new bike racks; making improvements to the plaza/courtyard on the south side of the building to include new landscaping and exterior furniture; installing new exterior lighting; cleaning the south elevation; repaving and restriping the staff parking lot; and installing a new landscaping solution. See attached file and outside link.
Posted Date
Oct 28, 2025
Due Date
Dec 12, 2025
Release: Oct 28, 2025
Close: Dec 12, 2025
Design-build project to include – replacing all of the windows; replacing the main entrance storefront, vestibule and doors; replacing the main entrance canopy; replacing secondary exterior doors and associated frames; connecting all doors included as part of the existing access control and security systems; cleaning and repairing the retaining walls at the front of the building; cleaning all concrete walks and ramps; repairing or replacing all damaged concrete walks and ramps; repairing or replacing all railings, and guardrails; installing new bike racks; making improvements to the plaza/courtyard on the south side of the building to include new landscaping and exterior furniture; installing new exterior lighting; cleaning the south elevation; repaving and restriping the staff parking lot; and installing a new landscaping solution. See attached file and outside link.
The renovation scope includes upgrades across multiple areas. In the mechanical room, walls, doors, and ceilings will be cleaned, patched, and painted; unused equipment will be removed; and the HVAC system will be converted to natural gas, eliminating the need for the oil tank. Staff and Patron Restrooms will get all-new fixtures, LED lighting, and improved accessibility. Staff restrooms will include a closet and concealed piping, while patron restrooms will be reconfigured for single-use with ADA compliance, a baby changing station, and new tile. The Staff Area will receive new carpet, modular walls, a drop ceiling, and a reversed door swing. The Staff Lounge will include a sink, microwave, new shelving, counters, and a drywall partition separating it from the multipurpose area. The children’s and adult areas will receive new flooring, painted walls, glazed brick, reconfigured shelving, and ceiling grid upgrades. Exterior work includes replacing the trim coil and soffit, as well as repainting ADA-compliant handrails and smoking areas. Data and A/V systems will be updated with relocated power poles and a new monitor. Doors and hardware will switch to lever handles, and minor electrical work will include new outlets, switches, and lighting. General notes address project duration, ADA compliance, finish selections, and furniture layouts provided by the Owner.
Posted Date
Oct 6, 2025
Due Date
Nov 7, 2025
Release: Oct 6, 2025
Close: Nov 7, 2025
The renovation scope includes upgrades across multiple areas. In the mechanical room, walls, doors, and ceilings will be cleaned, patched, and painted; unused equipment will be removed; and the HVAC system will be converted to natural gas, eliminating the need for the oil tank. Staff and Patron Restrooms will get all-new fixtures, LED lighting, and improved accessibility. Staff restrooms will include a closet and concealed piping, while patron restrooms will be reconfigured for single-use with ADA compliance, a baby changing station, and new tile. The Staff Area will receive new carpet, modular walls, a drop ceiling, and a reversed door swing. The Staff Lounge will include a sink, microwave, new shelving, counters, and a drywall partition separating it from the multipurpose area. The children’s and adult areas will receive new flooring, painted walls, glazed brick, reconfigured shelving, and ceiling grid upgrades. Exterior work includes replacing the trim coil and soffit, as well as repainting ADA-compliant handrails and smoking areas. Data and A/V systems will be updated with relocated power poles and a new monitor. Doors and hardware will switch to lever handles, and minor electrical work will include new outlets, switches, and lighting. General notes address project duration, ADA compliance, finish selections, and furniture layouts provided by the Owner.
The Enoch Pratt Free Library is seeking proposals for statewide electronic resources to support the Sailor Electronic Resources Project, ensuring equitable access to databases for Maryland residents and public K-12 schools. The contract term is 4 years.
Posted Date
Aug 26, 2024
Due Date
Nov 1, 2024
Release: Aug 26, 2024
Close: Nov 1, 2024
The Enoch Pratt Free Library is seeking proposals for statewide electronic resources to support the Sailor Electronic Resources Project, ensuring equitable access to databases for Maryland residents and public K-12 schools. The contract term is 4 years.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis