Discover Opportunities months before the RFP drops
Learn more →The project will develop approx. 79 acres of currently undeveloped land and includes new baseball fields, multi-use/soccer fields, expanded parking areas, a dog park, a splash pad, pavilions, restrooms, shelters, sidewalks, and a multi-use trail. Associated site work includes drainage improvements, utility extensions, stormwater ponds, and other supporting infrastructure.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
The project will develop approx. 79 acres of currently undeveloped land and includes new baseball fields, multi-use/soccer fields, expanded parking areas, a dog park, a splash pad, pavilions, restrooms, shelters, sidewalks, and a multi-use trail. Associated site work includes drainage improvements, utility extensions, stormwater ponds, and other supporting infrastructure.
AvailableWork includes the cleaning and renovation of existing cross-drain pipes using approved Spin Cast, CIPP, or lining methods in accordance with GDOT Supplemental Specification 561. The project consists of approx. 410 LF of 36" and 48" pipelining at Honey Ridge Road and McCall Road, along with all required traffic control meeting MUTCD and Special Provision 150 standards.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
Work includes the cleaning and renovation of existing cross-drain pipes using approved Spin Cast, CIPP, or lining methods in accordance with GDOT Supplemental Specification 561. The project consists of approx. 410 LF of 36" and 48" pipelining at Honey Ridge Road and McCall Road, along with all required traffic control meeting MUTCD and Special Provision 150 standards.
AvailableConstruction of a dedicated left-turn lane and deceleration lane by widening the existing roadway, installing subgrade and base materials, placing asphalt pavement, adjusting/relocating drainage structures, utility relocates, adding signage and striping, and providing all necessary traffic control. The project includes new turn lanes, curb and gutter, revised entrance geometry, drainage upgrades, pavement reconstruction, and associated signage, striping, and erosion control measures.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
Construction of a dedicated left-turn lane and deceleration lane by widening the existing roadway, installing subgrade and base materials, placing asphalt pavement, adjusting/relocating drainage structures, utility relocates, adding signage and striping, and providing all necessary traffic control. The project includes new turn lanes, curb and gutter, revised entrance geometry, drainage upgrades, pavement reconstruction, and associated signage, striping, and erosion control measures.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis