Discover Opportunities months before the RFP drops
Learn more →The City of Gallup invites bids to install new waterlines along Carbon Coal Road and Industrial Park Road serving the McKinley County Industrial Park. The scope includes approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe, valves, a fire hydrant assembly, tie-ins, trenching with rock excavation, backfilling, and traffic control. Bids must be submitted through the City’s OpenGov e-Procurement portal by 2:00 pm local time on January 5, 2026.
Posted Date
-
Due Date
Jan 5, 2026
Close: Jan 5, 2026
The City of Gallup invites bids to install new waterlines along Carbon Coal Road and Industrial Park Road serving the McKinley County Industrial Park. The scope includes approximately 2,395 linear feet of 12-inch CL350 ductile iron pipe, valves, a fire hydrant assembly, tie-ins, trenching with rock excavation, backfilling, and traffic control. Bids must be submitted through the City’s OpenGov e-Procurement portal by 2:00 pm local time on January 5, 2026.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis