Discover Opportunities months before the RFP drops
Learn more →Contractor prequalification for educational facilities construction projects and repairs.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Contractor prequalification for educational facilities construction projects and repairs.
AvailableThe project consists of renovating the existing building 20. The work includes but is not limited to demolition, concrete, masonry, misc. metals, rough carpentry, roofing, doors, frames, hardware, glazing, drywall, ACT, flooring, painting, division 10 specialties, equipment, window shades, fire protection, plumbing, mechanical and electrical.
Posted Date
Nov 16, 2025
Due Date
Dec 12, 2025
Release: Nov 16, 2025
Close: Dec 12, 2025
The project consists of renovating the existing building 20. The work includes but is not limited to demolition, concrete, masonry, misc. metals, rough carpentry, roofing, doors, frames, hardware, glazing, drywall, ACT, flooring, painting, division 10 specialties, equipment, window shades, fire protection, plumbing, mechanical and electrical.
AvailableWork includes replacing two different roof systems, removal of existing shingle roof system (to decking) and discard all debris, inspect decking and replace as needed to support new roof system, fasten decking in accordance with building code, install underlayment for new metal roof system, install new eave metal along the perimeter, install new flashings, rake metal, and other roofing components to ensure a watertight system, two vertical wall sections: install new surface material, new peel and stick, and encapsulate with matching roof panels. See attached file.
Posted Date
Jul 2, 2025
Due Date
Jul 22, 2025
Release: Jul 2, 2025
Close: Jul 22, 2025
Work includes replacing two different roof systems, removal of existing shingle roof system (to decking) and discard all debris, inspect decking and replace as needed to support new roof system, fasten decking in accordance with building code, install underlayment for new metal roof system, install new eave metal along the perimeter, install new flashings, rake metal, and other roofing components to ensure a watertight system, two vertical wall sections: install new surface material, new peel and stick, and encapsulate with matching roof panels. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis