Discover Opportunities months before the RFP drops
Learn more →This project includes repairs to the eastern 13.5 miles of Canyon Road as well as embankment repair and riprap installation at the Falls Canyon Trailhead parking area. Canyon Road is a remote road intended for high-clearance vehicular access only. This project will restore the roadway from previous flooding damage and provide enhancements to minimize major damage from future flooding.
Posted Date
Dec 10, 2025
Due Date
Jan 28, 2026
Release: Dec 10, 2025
Close: Jan 28, 2026
This project includes repairs to the eastern 13.5 miles of Canyon Road as well as embankment repair and riprap installation at the Falls Canyon Trailhead parking area. Canyon Road is a remote road intended for high-clearance vehicular access only. This project will restore the roadway from previous flooding damage and provide enhancements to minimize major damage from future flooding.
AvailableThe National Park Service (NPS) issued a Sources Sought for rehabilitation of the Old Pinn Trailhead parking area and shuttle stop at Pinnacles National Park, CA. Work includes regrading and paving the parking surface to meet ABAAS, removal of deteriorated surfacing, drainage improvements, restriping, installation of an accessible prefabricated vault toilet with holding tank, extension of water line and pump, and creation of designated shuttle stop areas with shade structures and benches. The anticipated period of performance is 365 calendar days and the notice is intended to gather information to inform acquisition strategy (NAICS 237310).
Posted Date
Dec 9, 2025
Due Date
Jan 15, 2026
Release: Dec 9, 2025
Close: Jan 15, 2026
The National Park Service (NPS) issued a Sources Sought for rehabilitation of the Old Pinn Trailhead parking area and shuttle stop at Pinnacles National Park, CA. Work includes regrading and paving the parking surface to meet ABAAS, removal of deteriorated surfacing, drainage improvements, restriping, installation of an accessible prefabricated vault toilet with holding tank, extension of water line and pump, and creation of designated shuttle stop areas with shade structures and benches. The anticipated period of performance is 365 calendar days and the notice is intended to gather information to inform acquisition strategy (NAICS 237310).
AvailableReplace the water line serving the housing area, campground operations and replace the water line serving the wetherill and house community comfort station.
Posted Date
Nov 24, 2025
Due Date
Dec 8, 2025
Release: Nov 24, 2025
Close: Dec 8, 2025
Replace the water line serving the housing area, campground operations and replace the water line serving the wetherill and house community comfort station.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis