Discover Opportunities months before the RFP drops
Learn more →Project consists of rehabilitating the sanitary sewer system by performing cure-in-place pipe lining, manhole rehabilitation and restoration as shown on the plans and described in the specifications. This work shall include all labor, materials, supplies, transportation, equipment, and services necessary and required to perform the project. See outside link.
Posted Date
Dec 8, 2025
Due Date
Feb 24, 2026
Release: Dec 8, 2025
Close: Feb 24, 2026
Project consists of rehabilitating the sanitary sewer system by performing cure-in-place pipe lining, manhole rehabilitation and restoration as shown on the plans and described in the specifications. This work shall include all labor, materials, supplies, transportation, equipment, and services necessary and required to perform the project. See outside link.
AvailableProject consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
Posted Date
Dec 2, 2025
Due Date
Jan 14, 2026
Release: Dec 2, 2025
Close: Jan 14, 2026
Project consists of the removal of the district's current digester no. 1 cover and replacing it with a new digester cover. This includes removal and re-installation of the existing linear motion mixing equipment, and the replacement of the drive for the mixing equipment. The project includes emptying and cleaning of digester no. 1. The project will also consist of associated site work, structural, building components, electrical work, instrumentation and controls as specified herein.
AvailableRelocation of an 8" thickened sludge force main (TWAS) with new pipe being DR-21 with pressure rating of 200 PSI and approx., 510 LF in length. Included is all fittings, tie-in, thrust blocking, bedding, compaction, and fill; together with in-place abandonment of existing 8" DI pipe.
Posted Date
Aug 29, 2025
Due Date
Oct 10, 2025
Release: Aug 29, 2025
Close: Oct 10, 2025
Relocation of an 8" thickened sludge force main (TWAS) with new pipe being DR-21 with pressure rating of 200 PSI and approx., 510 LF in length. Included is all fittings, tie-in, thrust blocking, bedding, compaction, and fill; together with in-place abandonment of existing 8" DI pipe.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis