Discover Opportunities months before the RFP drops
Learn more →Remove existing 7'-4" x 5'-6" CMP Elliptical culvert and replace with a new 10'-6" x 5'-7" Bottomless Aluminum Box Culvert complete with aluminum footing plates, lean concrete sub-footers and aluminum structural plate endwalls.
Posted Date
Dec 3, 2025
Due Date
Jan 16, 2026
Release: Dec 3, 2025
Close: Jan 16, 2026
Remove existing 7'-4" x 5'-6" CMP Elliptical culvert and replace with a new 10'-6" x 5'-7" Bottomless Aluminum Box Culvert complete with aluminum footing plates, lean concrete sub-footers and aluminum structural plate endwalls.
AvailableInstall asphalt on 3 sections of 3 roads. 1- Bavarian Hill Road 20'x1400' starting at SR-652 1 lift 3" of 19 MM and 1 lift 1.5" of 9.5 MM, with 2A shoulders sprayed with AEP oil; 2. Steep Hill Road 18"x1400', starting at SR-652 1 lift 3" of 19 MM and 1 lift 1.5" of 9.5 MM, with 2A shoulders sprayed with AEP oil; 3. Main Ave, 18"x1400', starting at SR-652 to Overlook Road, 1 lift 2" of 9.5 MM, with 2A shoulders sprayed with AEP oil.
Posted Date
Aug 8, 2025
Due Date
Aug 26, 2025
Release: Aug 8, 2025
Close: Aug 26, 2025
Install asphalt on 3 sections of 3 roads. 1- Bavarian Hill Road 20'x1400' starting at SR-652 1 lift 3" of 19 MM and 1 lift 1.5" of 9.5 MM, with 2A shoulders sprayed with AEP oil; 2. Steep Hill Road 18"x1400', starting at SR-652 1 lift 3" of 19 MM and 1 lift 1.5" of 9.5 MM, with 2A shoulders sprayed with AEP oil; 3. Main Ave, 18"x1400', starting at SR-652 to Overlook Road, 1 lift 2" of 9.5 MM, with 2A shoulders sprayed with AEP oil.
Work includes 6,370 SY Bituminous Seal Coat using a Polymer Modified Emulsion and #8 Stone with a 1.0% Loss by Wash, Surface Category Condition "C", ADT <100; 4,548 SY Bituminous Seal Coat using a Polymer Modified Emulsion and #8 Stone with a 1.0% Loss by Wash, Surface Category Condition “C”, ADT <100; 4,134 SY Bituminous Seal Coat using a Polymer Modified Emulsion and #8 Stone with a 1.0% Loss by Wash, Surface Category Condition “C”, ADT <100.
Posted Date
Mar 5, 2025
Due Date
Apr 17, 2025
Release: Mar 5, 2025
Close: Apr 17, 2025
Work includes 6,370 SY Bituminous Seal Coat using a Polymer Modified Emulsion and #8 Stone with a 1.0% Loss by Wash, Surface Category Condition "C", ADT <100; 4,548 SY Bituminous Seal Coat using a Polymer Modified Emulsion and #8 Stone with a 1.0% Loss by Wash, Surface Category Condition “C”, ADT <100; 4,134 SY Bituminous Seal Coat using a Polymer Modified Emulsion and #8 Stone with a 1.0% Loss by Wash, Surface Category Condition “C”, ADT <100.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis