Discover Opportunities months before the RFP drops
Learn more →New bridge will be approx. 19' long and 27' wide and when finished will have an 8" concrete deck. Contractor shall: Form and pour two (2) concrete head walls (caps) 3' by 3' by 27'. Head walls shall include two (2) layers of steel reinforcing rod, two (2) 7 5/8 pipes supporting 8" channels set at height of cap. Set and weld bridge beams. Install metal deck form (stay in place form), place and tie 2 layers of reinforcing steel. See attached file.
Posted Date
Dec 4, 2025
Due Date
Dec 26, 2025
Release: Dec 4, 2025
Close: Dec 26, 2025
New bridge will be approx. 19' long and 27' wide and when finished will have an 8" concrete deck. Contractor shall: Form and pour two (2) concrete head walls (caps) 3' by 3' by 27'. Head walls shall include two (2) layers of steel reinforcing rod, two (2) 7 5/8 pipes supporting 8" channels set at height of cap. Set and weld bridge beams. Install metal deck form (stay in place form), place and tie 2 layers of reinforcing steel. See attached file.
AvailableBituminous materials; aggregates for bituminous surface courses and base and traffic bound surface courses; sand- asphalt base course; blended crushed limestone and sand reclaimed crushed asphaltic concrete; corrugated metal pipe; poly pipe; class "A", class "AA" and class "c" concrete. Various herbicides and pesticides, or their equivalents and hauling chips, crusher run, crushed granite, surge, limestone, gyp rock, and rip rap for county highway projects.
Posted Date
Nov 5, 2025
Due Date
Dec 1, 2025
Release: Nov 5, 2025
Close: Dec 1, 2025
Bituminous materials; aggregates for bituminous surface courses and base and traffic bound surface courses; sand- asphalt base course; blended crushed limestone and sand reclaimed crushed asphaltic concrete; corrugated metal pipe; poly pipe; class "A", class "AA" and class "c" concrete. Various herbicides and pesticides, or their equivalents and hauling chips, crusher run, crushed granite, surge, limestone, gyp rock, and rip rap for county highway projects.
Digital printing and delivery of official ballots and sample ballots for all ballot orders placed during the period of this contract.
Posted Date
Nov 25, 2025
Due Date
Dec 12, 2025
Release: Nov 25, 2025
Close: Dec 12, 2025
Digital printing and delivery of official ballots and sample ballots for all ballot orders placed during the period of this contract.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis