Discover Opportunities months before the RFP drops
Learn more →The District is seeking replacement and configuration of Core and Edge switches and access points (AP), at the Elementary Schools, Middle Schools, and other instructional facilities along with replacement and installation of Uninterruptible Power Supply (UPS) units. The District also seeks to replace the edge switches located in the District's data center at the District Office. Implementation to include the following: purchase, installation and configuration for optimal connectivity for all listed items except access points (AP).
Posted Date
Oct 27, 2025
Due Date
Dec 5, 2025
Release: Oct 27, 2025
Close: Dec 5, 2025
The District is seeking replacement and configuration of Core and Edge switches and access points (AP), at the Elementary Schools, Middle Schools, and other instructional facilities along with replacement and installation of Uninterruptible Power Supply (UPS) units. The District also seeks to replace the edge switches located in the District's data center at the District Office. Implementation to include the following: purchase, installation and configuration for optimal connectivity for all listed items except access points (AP).
Installation of perimeter fencing and gates to secure both campuses. Perimeter chain link fencing - complete perimeter installation (6) pedestrian chain link gates - standard access points (1) double swing vehicle chain link gate - main vehicle access updates to 3 parking stalls - modifications as required and perimeter chain link fencing - complete perimeter installation (7) pedestrian chain link gates - standard access points (1) double swing vehicle chain link gate - main vehicle access updated sidewalk paving - modifications as required
Posted Date
Sep 16, 2025
Due Date
Oct 21, 2025
Release: Sep 16, 2025
Close: Oct 21, 2025
Installation of perimeter fencing and gates to secure both campuses. Perimeter chain link fencing - complete perimeter installation (6) pedestrian chain link gates - standard access points (1) double swing vehicle chain link gate - main vehicle access updates to 3 parking stalls - modifications as required and perimeter chain link fencing - complete perimeter installation (7) pedestrian chain link gates - standard access points (1) double swing vehicle chain link gate - main vehicle access updated sidewalk paving - modifications as required
Site preparation: a. Clear approximately 49,000 square feet (contractor to field verify) tennis court area of debris, vegetation, and any loose materials. : 1. Pressure wash all court area surfaces at 4,000 psi to remove blistered and loose surface coatings. Crack filling: a. Inspect the existing tennis court surface for cracks and fissures. B. Clean cracks thoroughly to remove debris and prepare them for filling. C. All major cracks shall be ground level, cleaned, tack coated, and hand filled with plexipave s (or equivalent) court binder. D. All imperfections in the concrete surface such spalls, pop-outs, broken areas, and chipping shall be repaired. See attached file for full scope.
Posted Date
Jun 23, 2025
Due Date
Jul 3, 2025
Release: Jun 23, 2025
Close: Jul 3, 2025
Site preparation: a. Clear approximately 49,000 square feet (contractor to field verify) tennis court area of debris, vegetation, and any loose materials. : 1. Pressure wash all court area surfaces at 4,000 psi to remove blistered and loose surface coatings. Crack filling: a. Inspect the existing tennis court surface for cracks and fissures. B. Clean cracks thoroughly to remove debris and prepare them for filling. C. All major cracks shall be ground level, cleaned, tack coated, and hand filled with plexipave s (or equivalent) court binder. D. All imperfections in the concrete surface such spalls, pop-outs, broken areas, and chipping shall be repaired. See attached file for full scope.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.