Learn more →work includes approx 100 CY rock exacavation; 200 EA water service connection; 130 EA 3/4" to 1" service replacement/installation; 6,000 LF 3/4" to 1" copper tubing (public side); 5,000 SY cold milling and placement of asphalt pavement (1 1/2" depth). See outside link.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
work includes approx 100 CY rock exacavation; 200 EA water service connection; 130 EA 3/4" to 1" service replacement/installation; 6,000 LF 3/4" to 1" copper tubing (public side); 5,000 SY cold milling and placement of asphalt pavement (1 1/2" depth). See outside link.
AvailableProvide outside legal/attorney services.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
Provide outside legal/attorney services.
AvailableWork includes demolition and replacement of three horizontal split case pumps and installation of one additional horizontal split case pump, including all associated valves, piping, and appurtenances. The project also includes installation of a new room within the pump station to house new vfds, demolition and replacement of the HVAC system within the pump station, demolition and replacement of large diameter yard piping, valves, and appurtenances, and modifications to the sanitary sewerage system. All supporting civil, structural, plumbing, electrical, and instrumentation work is also included in the project. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 20, 2026
Release: Dec 9, 2025
Close: Jan 20, 2026
Work includes demolition and replacement of three horizontal split case pumps and installation of one additional horizontal split case pump, including all associated valves, piping, and appurtenances. The project also includes installation of a new room within the pump station to house new vfds, demolition and replacement of the HVAC system within the pump station, demolition and replacement of large diameter yard piping, valves, and appurtenances, and modifications to the sanitary sewerage system. All supporting civil, structural, plumbing, electrical, and instrumentation work is also included in the project. See outside link.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis