Discover Opportunities months before the RFP drops
Learn more →Excavate the portal area and then install a properly designed and constructed portal structure and replacement gate, with steel sets extending from approximately Station 0+84 to Station 1+12.5. It is recommended that these sets be lagged with steel channel or other steel material and that cavities overhead be filled with polyurea silicate void filling foam to prevent impact loading. As a matter of routine safety, the entire adit should be thoroughly scaled and afterwards, any rockfall or debris on the invert should be removed to eliminate unnecessary tripping hazards. Existing tripping hazards should be cleaned up as well. Rockbolting and meshing should be installed as an appropriate risk reduction measure to protect personnel during safety inspections.
Posted Date
Sep 22, 2025
Due Date
Oct 22, 2025
Release: Sep 22, 2025
Close: Oct 22, 2025
Excavate the portal area and then install a properly designed and constructed portal structure and replacement gate, with steel sets extending from approximately Station 0+84 to Station 1+12.5. It is recommended that these sets be lagged with steel channel or other steel material and that cavities overhead be filled with polyurea silicate void filling foam to prevent impact loading. As a matter of routine safety, the entire adit should be thoroughly scaled and afterwards, any rockfall or debris on the invert should be removed to eliminate unnecessary tripping hazards. Existing tripping hazards should be cleaned up as well. Rockbolting and meshing should be installed as an appropriate risk reduction measure to protect personnel during safety inspections.
Remove 2 miles of burnt non-functional existing fence and reconstruct with woven wire with 1 strand barbed wire.
Posted Date
Sep 11, 2025
Due Date
Sep 19, 2025
Release: Sep 11, 2025
Close: Sep 19, 2025
Remove 2 miles of burnt non-functional existing fence and reconstruct with woven wire with 1 strand barbed wire.
This requirement includes software licensing, installation, data migration, training, and a five-year service and maintenance agreement.
Posted Date
Sep 11, 2025
Due Date
Sep 16, 2025
Release: Sep 11, 2025
Close: Sep 16, 2025
This requirement includes software licensing, installation, data migration, training, and a five-year service and maintenance agreement.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis