Discover Opportunities months before the RFP drops
Learn more →Asphaltic resurfacing on various county streets, including variable depth milling, patching, and pavement markings.
Posted Date
Nov 14, 2025
Due Date
Dec 11, 2025
Release: Nov 14, 2025
Close: Dec 11, 2025
Asphaltic resurfacing on various county streets, including variable depth milling, patching, and pavement markings.
Traffic Signals Flashing Yellow Arrow Upgrades 2025. Project consists of upgrading the traffic signal equipment at thirteen (13) intersections to add flashing yellow arrow displays for the left turn movement as required.
Posted Date
Nov 28, 2025
Due Date
Dec 18, 2025
Release: Nov 28, 2025
Close: Dec 18, 2025
Traffic Signals Flashing Yellow Arrow Upgrades 2025. Project consists of upgrading the traffic signal equipment at thirteen (13) intersections to add flashing yellow arrow displays for the left turn movement as required.
AvailableProject consists of upgrading the traffic signal equipment at thirteen intersections to add flashing yellow arrow displays for the left turn movement as required. Install basic network device configuration and test ip addressable equipment with the department's network. Traffic control signal installations shall meet the appropriate nesc requirements. Furnish and install electrical cables for traffic control devices and the power service as required. Ground the controller cabinet assemblies, controller, poles, pullboxes, and conduit to reduce extraneous voltage to protect personnel or equipment; etc, see attached file.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Project consists of upgrading the traffic signal equipment at thirteen intersections to add flashing yellow arrow displays for the left turn movement as required. Install basic network device configuration and test ip addressable equipment with the department's network. Traffic control signal installations shall meet the appropriate nesc requirements. Furnish and install electrical cables for traffic control devices and the power service as required. Ground the controller cabinet assemblies, controller, poles, pullboxes, and conduit to reduce extraneous voltage to protect personnel or equipment; etc, see attached file.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis