Discover Opportunities months before the RFP drops
Learn more →Coachella Valley Water District is inviting bids for the refurbishment of six rectangular secondary clarifiers at Water Reclamation Plant No. 10. These clarifiers are essential to the secondary treatment process, enabling the gravity settling and removal of suspended solids to ensure effective water reclamation operations.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
Coachella Valley Water District is inviting bids for the refurbishment of six rectangular secondary clarifiers at Water Reclamation Plant No. 10. These clarifiers are essential to the secondary treatment process, enabling the gravity settling and removal of suspended solids to ensure effective water reclamation operations.
AvailableCoachella Valley Water District seeks bidders to perform civil, mechanical, and electrical upgrades to Lift Station 55-12 and Lift Station 81-07, including relining the interior wet well at LS 81-07, replacing chemical odor scrubbers at both stations, and installing new open-bed biofilter odor control systems with engineered media and irrigation. The solicitation requires Installation Floater/Builders Risk insurance (including Flood and Earthquake) to be provided within 15 days of Notice of Award and includes a non-mandatory pre-bid conference scheduled for 2025-12-02 in Palm Desert.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Coachella Valley Water District seeks bidders to perform civil, mechanical, and electrical upgrades to Lift Station 55-12 and Lift Station 81-07, including relining the interior wet well at LS 81-07, replacing chemical odor scrubbers at both stations, and installing new open-bed biofilter odor control systems with engineered media and irrigation. The solicitation requires Installation Floater/Builders Risk insurance (including Flood and Earthquake) to be provided within 15 days of Notice of Award and includes a non-mandatory pre-bid conference scheduled for 2025-12-02 in Palm Desert.
AvailableInstallation, and configuration of Video Management System software (VMS). The software shall be configured and implemented to seamlessly integrate with the existing Bosch VMS. The primary objective of this project is to update the VMS and equipment to enhance security and operational efficiency of CVWD facilities by implementing a robust, scalable, and reliable video surveillance solution.
Posted Date
Oct 23, 2025
Due Date
Nov 13, 2025
Release: Oct 23, 2025
Close: Nov 13, 2025
Installation, and configuration of Video Management System software (VMS). The software shall be configured and implemented to seamlessly integrate with the existing Bosch VMS. The primary objective of this project is to update the VMS and equipment to enhance security and operational efficiency of CVWD facilities by implementing a robust, scalable, and reliable video surveillance solution.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis