Learn more →Project consist of approx 20,380 LF of 2" DR 21 PVC waterline; 920 LF of 2"DR 11 HDPE waterline; 1,380 LF of 6" HDPE waterline directional bore; 510 LF of 12" DR 11 HDPE casing; 660 LF of 12" steel casing. See outside link.
Posted Date
Nov 21, 2025
Due Date
Dec 11, 2025
Release: Nov 21, 2025
Close: Dec 11, 2025
Project consist of approx 20,380 LF of 2" DR 21 PVC waterline; 920 LF of 2"DR 11 HDPE waterline; 1,380 LF of 6" HDPE waterline directional bore; 510 LF of 12" DR 11 HDPE casing; 660 LF of 12" steel casing. See outside link.
The contract shall consist of the construction of a 150,000 gallon elevated water storage tanks with all appurtenances as shown in the plans and specifications for a fully operational facility. 300 LF provide equipment, materials and labor to construct fencing with double gate measuring 20' as shown on plans and described on the dtail sheet; 1 LS provide equipment, materials and labor to construct altitude valve and vault, bypass, all valves, fittings, anchors and hydrant as shown on detail sheet 5; 300 LF provide equipment, materials and labor to install 12" dr-21 pvc waterline; 1 ea provide equipment, materials and labor to install 12" gate valve with box; 1 ea provide equipment, materials and labor to install 12" x 12" tee; 1 ea provide equipment, materials and labor to install 12" stub out with cap. See attached file.
Posted Date
Jul 16, 2025
Due Date
Aug 12, 2025
Release: Jul 16, 2025
Close: Aug 12, 2025
The contract shall consist of the construction of a 150,000 gallon elevated water storage tanks with all appurtenances as shown in the plans and specifications for a fully operational facility. 300 LF provide equipment, materials and labor to construct fencing with double gate measuring 20' as shown on plans and described on the dtail sheet; 1 LS provide equipment, materials and labor to construct altitude valve and vault, bypass, all valves, fittings, anchors and hydrant as shown on detail sheet 5; 300 LF provide equipment, materials and labor to install 12" dr-21 pvc waterline; 1 ea provide equipment, materials and labor to install 12" gate valve with box; 1 ea provide equipment, materials and labor to install 12" x 12" tee; 1 ea provide equipment, materials and labor to install 12" stub out with cap. See attached file.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis