Discover Opportunities months before the RFP drops
Learn more →Work consists of sidewalk replacement. The project includes construction of 4" reinforced sidewalk paving replacement throughout the city. Work includes, 1,610 SY of remove and dispose of existing 4" thick concrete sidewalk; 1,610 SY of furnish and install 4" thick reinforced concrete 3000 psi, including bank sand for sidewalk base (up to 2" base); 3,630 SF of furnish and install groundcover (sod, jasmine ivy, etc. ) to match existing disturbed groundcover, up to 6 inches on either side of concrete replacement.
Posted Date
-
Due Date
Sep 10, 2025
Release: -
Close: Sep 10, 2025
Work consists of sidewalk replacement. The project includes construction of 4" reinforced sidewalk paving replacement throughout the city. Work includes, 1,610 SY of remove and dispose of existing 4" thick concrete sidewalk; 1,610 SY of furnish and install 4" thick reinforced concrete 3000 psi, including bank sand for sidewalk base (up to 2" base); 3,630 SF of furnish and install groundcover (sod, jasmine ivy, etc. ) to match existing disturbed groundcover, up to 6 inches on either side of concrete replacement.
The purpose of this project is to provide laboratory analytical services on environmental samples
Posted Date
Apr 29, 2025
Due Date
May 21, 2025
Release: Apr 29, 2025
Close: May 21, 2025
The purpose of this project is to provide laboratory analytical services on environmental samples
Purchase of treatment chemicals.
Posted Date
Apr 16, 2025
Due Date
May 7, 2025
Release: Apr 16, 2025
Close: May 7, 2025
Purchase of treatment chemicals.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis