Discover Opportunities months before the RFP drops
Learn more →The City of Waycross seeks qualifications and proposals from an engineering firm to provide pre- and post-award engineering services for community and economic development projects (water, sewer, street paving, drainage, etc.). Services include preliminary engineering reports, planning, design, cost estimating, bidding, construction oversight, quality control, and project closeout, and must comply with Georgia DCA and federal requirements including Build America Buy America documentation. Selection is qualifications-based and the contract duration will depend on available grant funding.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
The City of Waycross seeks qualifications and proposals from an engineering firm to provide pre- and post-award engineering services for community and economic development projects (water, sewer, street paving, drainage, etc.). Services include preliminary engineering reports, planning, design, cost estimating, bidding, construction oversight, quality control, and project closeout, and must comply with Georgia DCA and federal requirements including Build America Buy America documentation. Selection is qualifications-based and the contract duration will depend on available grant funding.
AvailableProject consists of removing approx. 685 FT of existing 60" CMP and installing approx. of 75 FT of 60” RCP under the two roads and creating approx. 530 FT long storm ditch through the field. Work includes filling existing sinkholes, removing and replacing two double wing catch basins, removing 1 existing headwall while installing 3 new headwalls, hauling off approx. 4,850 CF of dirt to create storm ditch, approx. 120 LF of curb and gutter replacement, approx. 235 SY of milling and overlay/pavement patch, traffic control, erosion control, and other miscellaneous work.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Project consists of removing approx. 685 FT of existing 60" CMP and installing approx. of 75 FT of 60” RCP under the two roads and creating approx. 530 FT long storm ditch through the field. Work includes filling existing sinkholes, removing and replacing two double wing catch basins, removing 1 existing headwall while installing 3 new headwalls, hauling off approx. 4,850 CF of dirt to create storm ditch, approx. 120 LF of curb and gutter replacement, approx. 235 SY of milling and overlay/pavement patch, traffic control, erosion control, and other miscellaneous work.
AvailableWork shall consist of cleaning accumulated sludge, grit, and sand from a 60-ft diameter digester.
Posted Date
Oct 22, 2025
Due Date
Nov 20, 2025
Release: Oct 22, 2025
Close: Nov 20, 2025
Work shall consist of cleaning accumulated sludge, grit, and sand from a 60-ft diameter digester.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis