Discover Opportunities months before the RFP drops
Learn more →Work includes generator maintenance services.
Posted Date
Dec 9, 2025
Due Date
Jan 11, 2026
Release: Dec 9, 2025
Close: Jan 11, 2026
Work includes generator maintenance services.
AvailableProvide rope rescue equipment. 1200 ft rope (7/16ths) (11mm) g11 (g); 2 rope bag (color pending) (29l); 1 rope bag (color pending) (35l); 1 rope bag (color pending) (122l); 2 rigtech (color pending) bag; 4 texora (2 meter); 4 texora (1meter); 6 presewn prusiks 18" (color chosen at purchase); 6 presewn prusiks 24" (color chosen at purchase); 1 edelrid kaa haul system; 390 ft tubular webbing (provide costs for varied length of 15, 20, and 30 ft, as well as colors available to be decided at time of purchase); 2 petzl paw rigging plate (m); 1 petzl paw rigging plate (l); 20 carabiners (g rated) (autolock pro series); 4 single pulleys (cmc proswivel 2.0). See outside link.
Posted Date
Aug 28, 2025
Due Date
Sep 15, 2025
Release: Aug 28, 2025
Close: Sep 15, 2025
Provide rope rescue equipment. 1200 ft rope (7/16ths) (11mm) g11 (g); 2 rope bag (color pending) (29l); 1 rope bag (color pending) (35l); 1 rope bag (color pending) (122l); 2 rigtech (color pending) bag; 4 texora (2 meter); 4 texora (1meter); 6 presewn prusiks 18" (color chosen at purchase); 6 presewn prusiks 24" (color chosen at purchase); 1 edelrid kaa haul system; 390 ft tubular webbing (provide costs for varied length of 15, 20, and 30 ft, as well as colors available to be decided at time of purchase); 2 petzl paw rigging plate (m); 1 petzl paw rigging plate (l); 20 carabiners (g rated) (autolock pro series); 4 single pulleys (cmc proswivel 2.0). See outside link.
Release: Aug 15, 2025
Close: Sep 9, 2025
Concrete patching.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis