Discover Opportunities months before the RFP drops
Learn more →Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Work includes construction of a pre-fabricated pedestrian bridge spanning 180' over the mahoning river, including abutment and pier construction, setting of the bridge, a trail connection to market street, an ada ramp structure on the perkins park side of the river, and decorative bridge lighting. The pre-fabricated bridge will be manufactured by others, with the procurement of the bridge and coordination of the installation being the responsibility of the general contractor.
Work includes installation of approx 5,330 LF of replacement waterline. Union street includes 2,330 LF from nevada street to austin avenue. Second street includes 3,000 LF from hayes avenue to main street. Includes connections to existing tributary watermains, service connections to right-of-way, replacing lead services to residences, site restoration, and other related water facility appurtenances.
Posted Date
Oct 16, 2025
Due Date
Oct 30, 2025
Release: Oct 16, 2025
Close: Oct 30, 2025
Work includes installation of approx 5,330 LF of replacement waterline. Union street includes 2,330 LF from nevada street to austin avenue. Second street includes 3,000 LF from hayes avenue to main street. Includes connections to existing tributary watermains, service connections to right-of-way, replacing lead services to residences, site restoration, and other related water facility appurtenances.
Purchase of high calcium quicklime, for use in the water pollution control center.
Posted Date
Jul 8, 2025
Due Date
Aug 28, 2025
Release: Jul 8, 2025
Close: Aug 28, 2025
Purchase of high calcium quicklime, for use in the water pollution control center.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis