Discover Opportunities months before the RFP drops
Learn more →The City of Vestavia Hills is soliciting sealed bids for the Wald Park Aquatic Complex Pool Heater Addition project. The work includes grading, concrete flatwork, plumbing installation, gas fitting, and landscaping, with add alternates for a new storage building and thermal pool blanket system. Bids are due January 7, 2026 at 2:00 pm local time, with a pre-bid meeting on December 30, 2025.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
The City of Vestavia Hills is soliciting sealed bids for the Wald Park Aquatic Complex Pool Heater Addition project. The work includes grading, concrete flatwork, plumbing installation, gas fitting, and landscaping, with add alternates for a new storage building and thermal pool blanket system. Bids are due January 7, 2026 at 2:00 pm local time, with a pre-bid meeting on December 30, 2025.
AvailableThe project includes, but not limited to, grading, concrete flat work, plumbing installation, gas fitting, and landscaping to facilitate the installation of a pool heater system. The project also includes add alternates to build a new storage building, thermal pool blanket and storage rack, and general storage racks. The new storage building is masonry and steel construction to match the existing facility architecture.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
The project includes, but not limited to, grading, concrete flat work, plumbing installation, gas fitting, and landscaping to facilitate the installation of a pool heater system. The project also includes add alternates to build a new storage building, thermal pool blanket and storage rack, and general storage racks. The new storage building is masonry and steel construction to match the existing facility architecture.
AvailableThe project includes 9,300 GAL of Tack Coat; 8,200 TONS of Milling; 2,000 SF of permanent markings; 10 EA Raise manholes; 10 EA of valve Box reset.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Close: Dec 18, 2025
The project includes 9,300 GAL of Tack Coat; 8,200 TONS of Milling; 2,000 SF of permanent markings; 10 EA Raise manholes; 10 EA of valve Box reset.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis