Discover Opportunities months before the RFP drops
Learn more →Firehouse no. 1 restroom alterations.
Posted Date
Nov 24, 2025
Due Date
Dec 17, 2025
Release: Nov 24, 2025
Close: Dec 17, 2025
Firehouse no. 1 restroom alterations.
AvailableThe work for each part of the tank is as follows: SSPC-SP10 Near White Metal Blast for the entire Interior wet. The Interior Dry of the tank should be cleaned using SSPC-SP10 "near white metal cleanliness". For the Exterior full SSPC-SP6 “Commercial Blast”, with Class Full Rigid 2A Containment. After the repairs and recoating have been completed, the existing guide rail system will be reinstalled on top of the Elevated Steel Hydropillar Tank Water Storage Tank.
Posted Date
Aug 9, 2025
Due Date
Sep 9, 2025
Release: Aug 9, 2025
Close: Sep 9, 2025
The work for each part of the tank is as follows: SSPC-SP10 Near White Metal Blast for the entire Interior wet. The Interior Dry of the tank should be cleaned using SSPC-SP10 "near white metal cleanliness". For the Exterior full SSPC-SP6 “Commercial Blast”, with Class Full Rigid 2A Containment. After the repairs and recoating have been completed, the existing guide rail system will be reinstalled on top of the Elevated Steel Hydropillar Tank Water Storage Tank.
Construction of station #1 locker rooms.
Posted Date
Mar 6, 2025
Due Date
Apr 2, 2025
Release: Mar 6, 2025
Close: Apr 2, 2025
Construction of station #1 locker rooms.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis