Discover Opportunities months before the RFP drops
Learn more →City of Tonganoxie seeks qualifications from playground equipment manufacturers or representatives for a design-build renovation of Chieftain Park playground: services include public engagement, design, site assessment/preparation, equipment/material procurement, installation, and warranties. Key points for vendors: procurement is design-build (progressive), equipment must meet ASTM/CPSC/ADA standards, installers NPSI-certified (or equivalent), 5% retainage on payments, maximum total project budget $1,000,000, and design services costs capped at 8% of total contract.
Posted Date
Dec 4, 2025
Due Date
Dec 30, 2025
Release: Dec 4, 2025
Close: Dec 30, 2025
City of Tonganoxie seeks qualifications from playground equipment manufacturers or representatives for a design-build renovation of Chieftain Park playground: services include public engagement, design, site assessment/preparation, equipment/material procurement, installation, and warranties. Key points for vendors: procurement is design-build (progressive), equipment must meet ASTM/CPSC/ADA standards, installers NPSI-certified (or equivalent), 5% retainage on payments, maximum total project budget $1,000,000, and design services costs capped at 8% of total contract.
AvailableRelease: Sep 30, 2025
Close: Oct 10, 2025
Reconstruction of front street.
Project includes the following Work: Install 2 new influent pumps; Install 1 new influent screen with 1 new washer / compactor; Construct a second aerobic treatment basin, CIP; Install new diffused aeration system within the existing aerobic digester; Construct blower pad and install two blowers with piping; Remove and replace Waste Activated Sludge (WAS) pump; Install launder covers in the two existing final clarifiers with clarifier mechanism repaint as alternate; Headworks building improvements - HVAC & Soffit; Associated site, piping and electrical improvements to accommodate new infrastructure.
Posted Date
Aug 16, 2025
Due Date
Sep 9, 2025
Release: Aug 16, 2025
Close: Sep 9, 2025
Project includes the following Work: Install 2 new influent pumps; Install 1 new influent screen with 1 new washer / compactor; Construct a second aerobic treatment basin, CIP; Install new diffused aeration system within the existing aerobic digester; Construct blower pad and install two blowers with piping; Remove and replace Waste Activated Sludge (WAS) pump; Install launder covers in the two existing final clarifiers with clarifier mechanism repaint as alternate; Headworks building improvements - HVAC & Soffit; Associated site, piping and electrical improvements to accommodate new infrastructure.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis