Discover Opportunities months before the RFP drops
Learn more →Work includes removing the existing tennis courts, fencing and associated improvements. Constructing a new post-tensioned concrete tennis court and two pickleball courts, fencing, accessible concrete walks, protection of existing electric services, MSD stormwater management with planting and site restoration.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
Close: Dec 16, 2025
Work includes removing the existing tennis courts, fencing and associated improvements. Constructing a new post-tensioned concrete tennis court and two pickleball courts, fencing, accessible concrete walks, protection of existing electric services, MSD stormwater management with planting and site restoration.
AvailableProvide HVAC systems replacement. This project contains the demolition and removal of existing equipment as well as the installation of new equipment to replace removed items. The equipment being demolished and replaced includes but is not limited to three (3) rooftop units serving the main level, three (3) gas furnaces and their associated condensing units serving the lower level, replacing one (1) gas furnace and its associated condenser serving the second floor, and replacing one (1) roof mounted exhausted fan. Additional work includes but is not limited to cleaning all existing hard ductwork in the building (excluding apparatus bay), replacing all flex duct on the main level and second floor, and rebalancing all building systems. See attached file.
Posted Date
Jun 20, 2025
Due Date
Jul 8, 2025
Release: Jun 20, 2025
Close: Jul 8, 2025
Provide HVAC systems replacement. This project contains the demolition and removal of existing equipment as well as the installation of new equipment to replace removed items. The equipment being demolished and replaced includes but is not limited to three (3) rooftop units serving the main level, three (3) gas furnaces and their associated condensing units serving the lower level, replacing one (1) gas furnace and its associated condenser serving the second floor, and replacing one (1) roof mounted exhausted fan. Additional work includes but is not limited to cleaning all existing hard ductwork in the building (excluding apparatus bay), replacing all flex duct on the main level and second floor, and rebalancing all building systems. See attached file.
Bariatric Ambulance Equipment. Stryker model 6083 mx-pro bariatric stretcher. Stryker mass casualty kit and floor plate. Xrs2400 medaramp and winch system, includes ramps, mounted winch box, whinch box plate, transition plate, roller quide, power harness, tow strap and all hardware; install of transafe and stryker mass casualty kit.
Posted Date
Nov 21, 2024
Due Date
Dec 2, 2024
Release: Nov 21, 2024
Close: Dec 2, 2024
Bariatric Ambulance Equipment. Stryker model 6083 mx-pro bariatric stretcher. Stryker mass casualty kit and floor plate. Xrs2400 medaramp and winch system, includes ramps, mounted winch box, whinch box plate, transition plate, roller quide, power harness, tow strap and all hardware; install of transafe and stryker mass casualty kit.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis