Discover Opportunities months before the RFP drops
Learn more →Provide 21 CY - imported fill placing; 590 SF - boradcast seed; 225 LF - install & trenching 2" PVC conduit; 2 EA - install light base, 34' light post and luminare. 1 LS construction staking; 1 LS quality controll testing; 1 LS mobilization and bonding; 1 LS temporary traffic control; 1 ls miscellaneous force account; 1 LS landscaping; 1 LS electrical; 21 CY imported fill placing; 590 sf broadcast seed; 225 lf install & trenching 2" PVC conduit; 65 LF boring & 3" HDPE carrier pipe; 6 EA pexco yellow city post - surface mount model; 590 sf median preparation; 6 CY 1" minus washed rock; 590 SF weed barrier; 355 LF 8" wide striping (yellow); 2 EA R10-25 push button sign.
Posted Date
Oct 9, 2025
Due Date
Oct 29, 2025
Release: Oct 9, 2025
Close: Oct 29, 2025
Provide 21 CY - imported fill placing; 590 SF - boradcast seed; 225 LF - install & trenching 2" PVC conduit; 2 EA - install light base, 34' light post and luminare. 1 LS construction staking; 1 LS quality controll testing; 1 LS mobilization and bonding; 1 LS temporary traffic control; 1 ls miscellaneous force account; 1 LS landscaping; 1 LS electrical; 21 CY imported fill placing; 590 sf broadcast seed; 225 lf install & trenching 2" PVC conduit; 65 LF boring & 3" HDPE carrier pipe; 6 EA pexco yellow city post - surface mount model; 590 sf median preparation; 6 CY 1" minus washed rock; 590 SF weed barrier; 355 LF 8" wide striping (yellow); 2 EA R10-25 push button sign.
The base bid includes the construction of an irrigation system encompassing approx., 5 acres of parkland with pipe ranging in sizes from 1" to 3" and all other associated irrigation appurtenances, the hauling and spreading of topsoil, and the seeding of affected areas.
Posted Date
Sep 17, 2025
Due Date
Oct 2, 2025
Release: Sep 17, 2025
Close: Oct 2, 2025
The base bid includes the construction of an irrigation system encompassing approx., 5 acres of parkland with pipe ranging in sizes from 1" to 3" and all other associated irrigation appurtenances, the hauling and spreading of topsoil, and the seeding of affected areas.
Replacement of the roof system at the fire station. Replacement of the roof to align with the insurance schedule.
Posted Date
Sep 13, 2025
Due Date
Sep 30, 2025
Release: Sep 13, 2025
Close: Sep 30, 2025
Replacement of the roof system at the fire station. Replacement of the roof to align with the insurance schedule.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis