Discover Opportunities months before the RFP drops
Learn more →Approx 2,500 CY Excavation - Channel and Pond; 1,800 CY Common Borrow Special (CV); 90 LF 30" RC Pipe Storm Sewer; 1,500 CY Random Riprap Class II-IV; 320 SY Reinforced Soil Slope; 570 LF Toewood Bench; etc.
Posted Date
Dec 4, 2025
Due Date
Dec 30, 2025
Release: Dec 4, 2025
Close: Dec 30, 2025
Approx 2,500 CY Excavation - Channel and Pond; 1,800 CY Common Borrow Special (CV); 90 LF 30" RC Pipe Storm Sewer; 1,500 CY Random Riprap Class II-IV; 320 SY Reinforced Soil Slope; 570 LF Toewood Bench; etc.
AvailableWork includes approx 54,000 SY Mill Bituminous Surface (Tapered, Full Width); 4,500 SY Mill Bituminous Surface (Full Depth); 450 LF Remove and Replace Concrete Curb and Gutter; 38,500 LF Curb Line Mastic Joint Adhesive; etc.
Posted Date
Jun 5, 2025
Due Date
Jun 30, 2025
Release: Jun 5, 2025
Close: Jun 30, 2025
Work includes approx 54,000 SY Mill Bituminous Surface (Tapered, Full Width); 4,500 SY Mill Bituminous Surface (Full Depth); 450 LF Remove and Replace Concrete Curb and Gutter; 38,500 LF Curb Line Mastic Joint Adhesive; etc.
Work includes approx. 27,000 SY Mill Bituminous Surface (Full Width); 2,900 TON Type SP 9.5 Wearing Course Mixture (3,C) - Roadway; 28,400 LF Pavement Striping (Paint); 24 HOUR Flagger; etc.
Posted Date
Apr 10, 2025
Due Date
May 8, 2025
Release: Apr 10, 2025
Close: May 8, 2025
Work includes approx. 27,000 SY Mill Bituminous Surface (Full Width); 2,900 TON Type SP 9.5 Wearing Course Mixture (3,C) - Roadway; 28,400 LF Pavement Striping (Paint); 24 HOUR Flagger; etc.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis