Discover Opportunities months before the RFP drops
Learn more →The City of Round Rock seeks qualified contractors to perform demolition and asbestos abatement for three residential buildings at 901 Emmanuel Street, Round Rock, TX, including removal of structures, concrete flatwork, and a CMU retaining wall, with asbestos work performed by a TDSHS-licensed abatement contractor in compliance with EPA NESHAP and OSHA. The RFQ is time-sensitive with a non-mandatory job walk on Dec 8, 2025, questions due Dec 10, 2025, and submissions due Dec 16, 2025 at 3:00 PM CST.
Posted Date
Dec 2, 2025
Due Date
Dec 16, 2025
Release: Dec 2, 2025
Close: Dec 16, 2025
The City of Round Rock seeks qualified contractors to perform demolition and asbestos abatement for three residential buildings at 901 Emmanuel Street, Round Rock, TX, including removal of structures, concrete flatwork, and a CMU retaining wall, with asbestos work performed by a TDSHS-licensed abatement contractor in compliance with EPA NESHAP and OSHA. The RFQ is time-sensitive with a non-mandatory job walk on Dec 8, 2025, questions due Dec 10, 2025, and submissions due Dec 16, 2025 at 3:00 PM CST.
AvailableWater Treatment Plant Miscellaneous Improvements project includes the demolition and construction of concentrated alum and polymer feed piping, alum day tanks, and associated instrumentation and appurtenances; demolition of Hydrofluorosilic bulk and day tank; construction of polymer bulk tank and day tank, alum day tanks, as well as associated instrumentation and appurtenances; demolition of existing 55-gallon polymer drum scales and associated appurtenances; demolition and construction of diluted alum and polymer piping, fluoride piping and various drain pipes; demolition and construction of mud valve stems, stem supports, and washdown water piping within existing sedimentation basins; replacement of anthracite coal filter media and filter underdrain inspection; electric generator installation and associated instrumentation and appurtenances for integration with the existing system; demolition of existing manual transfer switches and the construction of automatic transfer switches, as well as associated control and electrical improvements related to the instrumentation in the chemical feed area.
Posted Date
Nov 3, 2025
Due Date
Dec 18, 2025
Release: Nov 3, 2025
Close: Dec 18, 2025
Water Treatment Plant Miscellaneous Improvements project includes the demolition and construction of concentrated alum and polymer feed piping, alum day tanks, and associated instrumentation and appurtenances; demolition of Hydrofluorosilic bulk and day tank; construction of polymer bulk tank and day tank, alum day tanks, as well as associated instrumentation and appurtenances; demolition of existing 55-gallon polymer drum scales and associated appurtenances; demolition and construction of diluted alum and polymer piping, fluoride piping and various drain pipes; demolition and construction of mud valve stems, stem supports, and washdown water piping within existing sedimentation basins; replacement of anthracite coal filter media and filter underdrain inspection; electric generator installation and associated instrumentation and appurtenances for integration with the existing system; demolition of existing manual transfer switches and the construction of automatic transfer switches, as well as associated control and electrical improvements related to the instrumentation in the chemical feed area.
AvailableRelease: Nov 13, 2025
Close: Dec 9, 2025
Left Turn Lane Roadway improvement.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis